$2,100 – $7,300

Most Sarasota homeowners pay around $3,700 for electrical panel replacement, or $2,050$7,350 per panel upgrade. Budget another $110$420 for permit fees.

Full cost breakdown

Budget scope$2,100
Typical project$3,700
Premium / complex$7,300
per panel upgrade$2,050 – $7,350
Permit fees$110 – $420
Local premium+8% vs national
Timeline1 day of work, 1-4 weeks including utility coordination

What makes the number move

  • Service size: 100A, 150A or 200A
  • Meter can and service entrance conductor replacement
  • Overhead versus underground service
  • Surge protection and AFCI/GFCI breaker requirements
  • Utility disconnect and reconnect scheduling

How to pay less

  • • Get three written bids — spread between local bids on this project is routinely 25% or more.
  • • Schedule in the off-season; Sarasota contractors price peak demand higher.
  • • Confirm the permit fee is itemized rather than marked up inside the labor line.
  • • Verify the license at DBPR before paying a deposit; unlicensed work voids most claims.

Nearby city pricing

Frequently asked questions

Do I need a permit to replace an electrical panel?

Yes, always. An electrical permit is required, a licensed electrical contractor must perform the work in most Florida jurisdictions, and the utility will not reconnect service until the final inspection passes.

How long does a panel upgrade take?

The physical work is usually one day with power off for 4-8 hours. Utility disconnect scheduling and inspection generally stretch the total to one to four weeks.