Electrical

Electrical Panel Replacement: Cost, Permits & Timeline

Replacing or upgrading a residential electrical service panel, commonly from 100A to 200A, including new breakers, grounding, bonding and utility reconnection.

Model reviewed August 2026

Typical cost

$3,400

$1,900 – $6,800

per panel upgrade

$1,900 – $6,800

Permit

Required

$100 – $380

Timeline

1 day of work

1 day of work, 1-4 weeks including utility coordination

Do you need a permit for electrical panel replacement?

Yes

Electrical Panel Replacement is permitted and inspected work in essentially every jurisdiction. Typical fees run $100 to $380. A licensed contractor generally has to pull the permit.

What drives the cost

  • Service size: 100A, 150A or 200A
  • Meter can and service entrance conductor replacement
  • Overhead versus underground service
  • Surge protection and AFCI/GFCI breaker requirements
  • Utility disconnect and reconnect scheduling

Permit, inspections and documents

Permit statusrequired
Typical permit fee$100 – $380
Licensed contractor requiredUsually yes
Owner-builder allowedRarely
InspectionsUtility disconnect coordination, Rough electrical, Final electrical inspection
Timeline1 day of work, 1-4 weeks including utility coordination
DIY difficulty5/5 difficulty

Documents typically required

  • • Electrical permit application
  • • Licensed electrician information
  • • Load calculation
  • • Panel schedule

Electrical Panel Replacement cost by city

Local labor and material pricing applied to the national baseline.

CityTypical rangevs national
New York$3,400 – $12,000+77%
Los Angeles$2,800 – $9,900+46%
Miami$2,500 – $9,000+32%
Chicago$2,500 – $8,900+31%
Phoenix$2,000 – $7,100+4%
Dallas$1,900 – $6,900+2%
Houston$1,900 – $6,900+2%
Tampa$2,100 – $7,400+9%
Denver$2,200 – $8,000+18%
Orlando$2,000 – $7,100+5%
Atlanta$1,900 – $7,000+2%
Fort Lauderdale$2,400 – $8,600+26%

Electrical Panel Replacement across the country

National pricing, state-by-state pricing, and the tools behind both.

Frequently asked questions

How long does a panel upgrade take?

The physical work is usually one day with power off for 4-8 hours. Utility disconnect scheduling and inspection generally stretch the total to one to four weeks.

Do I need a permit for electrical panel replacement?

In most jurisdictions this work is permitted and inspected. Requirements are set locally, so confirm the current application and inspection checklist with your building department before work starts.

How long does electrical panel replacement take?

1 day of work, 1-4 weeks including utility coordination. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are service size: 100a, 150a or 200a; meter can and service entrance conductor replacement; overhead versus underground service.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.