Editorial standards
How we build our cost and permit data
Hometriva publishes modeled estimates and sourced regulatory facts, and labels which is which on every page. This page explains exactly how both are produced.
Model reviewed August 2026
Services mapped
572
Distinct home services covered
Geographic coverage
Nationwide coverage
50 states + Washington, D.C.
Calculators
47
Formulas published on every tool
Deep local city profiles
423
Local cost, permit and climate detail
Counties inventoried
478
862 municipalities tracked
Verified permit authorities
25
Checked against the issuing department
What the numbers mean
Hometriva covers 572 residential services and publishes cost, permit and project information across all 50 states and Washington, D.C. Every service is built toward one research standard — cost, permit, timeline, local factors and calculators — and we deepen coverage continuously, starting with the projects homeowners plan most.
What is a fact and what is a model
| Permit requirement | Sourced from the adopted state building code and local jurisdiction rules |
|---|---|
| Inspection list | Sourced from code-required inspection sequences |
| Building department links | Verified official government URLs only |
| Cost ranges | Modeled — national baseline × regional index |
| Permit fees | Modeled — base fee schedule × local permit index |
| Timelines | Modeled from typical scope and review duration |
The cost model
Every project carries a national baseline range (low, typical, high) plus a unit price. A location applies two multipliers: a cost index derived from regional labor and material pricing, and a permit index derived from local fee schedules. Local cost = baseline × cost index, rounded to a sensible increment. We show the resulting percentage difference against the national baseline on each page so the adjustment is visible rather than hidden. Estimates exclude structural surprises, hidden damage, and financing costs.
The regulatory layer
Building regulation in the United States is layered: a state adopts a model code, local governments amend it, and the department that issues the permit is sometimes the city and sometimes the county. We store the state-level basis once, let jurisdiction pages inherit it, and record the issuing department separately for each place we cover. A local amendment can add requirements but cannot fall below the state minimum, so where we have not confirmed a local amendment we present the state-level rule and link the jurisdiction's own building department rather than assert a local one. Some states — such as Florida with the 8th Edition (2023) Florida Building Code — enforce a single statewide code; others leave adoption largely to local governments, and our coverage depth reflects that difference.
Update cadence
- • Cost models reviewed quarterly; current model vintage is August 2026.
- • State code basis reviewed when a state adopts a new edition. Local amendments are only shown where we have recorded them from the jurisdiction itself.
- • Building department links re-checked when a page is edited.
- • Calculator formulas are published on the calculator page so you can verify the math yourself.
What we will not do
- • Invent contractor quotes, review counts, ratings or testimonials.
- • Present a modeled number as a verified quote.
- • Replace your building department — always confirm before you apply.
Corrections
If a fee schedule, permit rule or department link is wrong, we want to fix it. Start from the State hubs to find the jurisdiction page in question, then use the official source links there to confirm the current rule.
Primary sources
Sources & verification
- International Code Council — state adoption map
- U.S. Census Bureau — Building Permits Survey
- Bureau of Labor Statistics — construction wages and price indexes
- Florida Building Commission
Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.
