Southeast Florida

Home permits and project costs in Miami-Dade County, FL

Miami-Dade County has about 2,686,867 residents and its seat is Miami. If your address is outside city limits, Miami-Dade County — a home-rule charter county — is your permit authority.

Model reviewed August 2026

Local cost index

+15%

vs national average

Permit fee index

+28%

vs national baseline

Regulatory complexity

95/100

wind, flood and review load

Municipalities

17

cities with their own permit desk

Who issues permits in Miami-Dade County?

Depends on your address

Inside city limits, the city building department issues the permit. Outside city limits — unincorporated Miami-Dade County — the county building department reviews, permits and inspects the work. Both enforce the same code basis (8th Edition (2023) Florida Building Code), but fee schedules, zoning setbacks and review times differ.

Project costs in Miami-Dade County

National baselines adjusted by the regional labor and material index. Modeled estimates, not quotes.

ProjectTypical costPermit
Roof Replacement in Miami-Dade County$12,300 – $41,300Yes
AC Replacement in Miami-Dade County$6,300 – $18,900Yes
Fence Installation in Miami-Dade County$2,900 – $13,300Usually yes
Water Heater Replacement in Miami-Dade County$1,500 – $6,700Yes
Pool Installation in Miami-Dade County$47,700 – $144,300Yes
Window Replacement in Miami-Dade County$9,400 – $42,800Yes
Electrical Panel Replacement in Miami-Dade County$2,400 – $8,500Yes
Generator Installation in Miami-Dade County$8,100 – $27,300Yes
Solar Panel Installation in Miami-Dade County$18,200 – $58,200Yes
Kitchen Remodel in Miami-Dade County$21,100 – $107,700It depends
Bathroom Remodel in Miami-Dade County$10,600 – $49,400It depends
Driveway Replacement in Miami-Dade County$5,100 – $23,000Usually yes
Paver Patio & Walkway in Miami-Dade County$4,100 – $18,900It depends
Deck Construction in Miami-Dade County$6,800 – $34,600Yes
Shed Installation in Miami-Dade County$2,100 – $14,200It depends
Whole-House Repipe in Miami-Dade County$5,600 – $19,900Yes
EV Charger Installation in Miami-Dade County$1,000 – $5,200Yes
Hurricane Shutter Installation in Miami-Dade County$4,100 – $23,100Yes
Pool Enclosure / Screen Cage in Miami-Dade County$11,400 – $53,300Yes
Septic System Replacement in Miami-Dade County$9,500 – $35,500Yes
Impact Window Installation in Miami-Dade County$11,500 – $53,600Yes
Exterior Door Replacement in Miami-Dade County$1,100 – $8,100Usually yes
Garage Door Replacement in Miami-Dade County$1,800 – $9,500Yes
Siding Installation in Miami-Dade County$9,900 – $47,000Usually yes
Stucco Repair in Miami-Dade County$1,100 – $18,900It depends
Soffit & Fascia Replacement in Miami-Dade County$2,200 – $13,600It depends
Gutter Installation in Miami-Dade County$1,000 – $7,500Usually no
Roof Repair in Miami-Dade County$500 – $6,000It depends
Flat Roof Replacement in Miami-Dade County$7,700 – $35,900Yes
Attic Insulation in Miami-Dade County$1,400 – $8,600Usually no
Ductwork Replacement in Miami-Dade County$3,100 – $14,700Yes
Mini Split Installation in Miami-Dade County$2,900 – $15,300Yes
Flooring Installation in Miami-Dade County$2,900 – $23,100Usually no
Tile Installation in Miami-Dade County$2,100 – $18,700Usually no
Interior Painting in Miami-Dade County$1,800 – $11,200Usually no
Exterior Painting in Miami-Dade County$3,300 – $17,700Usually no
Drywall Repair in Miami-Dade County$400 – $5,300Usually no
Kitchen Cabinet Refacing in Miami-Dade County$5,200 – $23,300Usually no
Countertop Replacement in Miami-Dade County$2,500 – $13,700Usually no
Tub to Shower Conversion in Miami-Dade County$4,300 – $19,500Usually yes
Sod Installation in Miami-Dade County$1,000 – $8,000Usually no
Irrigation System Installation in Miami-Dade County$2,600 – $11,800It depends
Tree Removal in Miami-Dade County$500 – $6,700It depends
Outdoor Kitchen in Miami-Dade County$7,300 – $54,500Usually yes
Seawall Repair in Miami-Dade County$10,300 – $122,200Yes
Dock Construction in Miami-Dade County$11,600 – $109,300Yes
Well Installation in Miami-Dade County$6,900 – $31,500Yes
Mold Remediation in Miami-Dade County$1,800 – $18,200It depends
Water Softener Installation in Miami-Dade County$1,500 – $7,900Usually yes
Home Addition in Miami-Dade County$57,600 – $358,700Yes
Heat Pump Replacement in Miami-Dade County$7,900 – $26,900Yes
Furnace Replacement in Miami-Dade County$3,900 – $14,000Yes
Foundation Repair in Miami-Dade County$3,400 – $38,700Usually yes
Basement Waterproofing in Miami-Dade County$3,500 – $21,300It depends
Drain Field Replacement in Miami-Dade County$7,400 – $31,000Yes
Toilet Installation in Miami-Dade County$300 – $1,300Usually no
Hot Tub Installation in Miami-Dade County$6,700 – $26,700Usually yes

County facts

County seatMiami
Population2,686,867
Government typeHome-rule charter county
RegionSoutheast Florida
Municipalities tracked17
Building codeEffective December 31, 20238th Edition (2023) Florida Building Code

Cities and towns in Miami-Dade County

Municipalities may run their own building department with different fees and rules.

Miami, FLFull local coverage
HialeahPermits handled locally · confirm requirements with the municipality
Miami GardensPermits handled locally · confirm requirements with the municipality
Miami BeachPermits handled locally · confirm requirements with the municipality
HomesteadPermits handled locally · confirm requirements with the municipality
DoralPermits handled locally · confirm requirements with the municipality
North MiamiPermits handled locally · confirm requirements with the municipality
Coral GablesPermits handled locally · confirm requirements with the municipality
Cutler BayPermits handled locally · confirm requirements with the municipality
AventuraPermits handled locally · confirm requirements with the municipality
Palmetto BayPermits handled locally · confirm requirements with the municipality
Miami LakesPermits handled locally · confirm requirements with the municipality
Kendall (unincorporated)Permits handled locally · confirm requirements with the municipality
Sunny Isles BeachPermits handled locally · confirm requirements with the municipality
Key BiscaynePermits handled locally · confirm requirements with the municipality
PinecrestPermits handled locally · confirm requirements with the municipality
South MiamiPermits handled locally · confirm requirements with the municipality

Common questions

Who issues my building permit in Florida?

Whoever governs your address. If you are inside city limits, the city building department usually issues the permit. If you are in an unincorporated area — about half of Florida households — the county building department is the permit authority.

Can I pull my own permit in Florida?

Usually yes, under the owner-builder exemption in Fla. Stat. § 489.103(7), if you own and occupy the home, sign the disclosure statement, and do the work yourself or with employees you directly hire. You also cannot sell the home within one year of completion without explaining the work.

What happens if I skip the permit?

Unpermitted work commonly draws double or triple permit fees, a stop-work order, and an open code case. It also surfaces at resale and can cause an insurance claim on that system to be denied.

Does the Florida Building Code change often?

Florida is on the 8th Edition (2023) Florida Building Code, effective December 31, 2023. The Florida Building Commission updates the code on a three-year cycle, and the 2026 update is currently in process, so local amendments and product approval lists should be rechecked before a job starts.

Do local cities have their own rules on top of the state code?

Yes. Florida allows local amendments under defined conditions, and the Florida Building Commission maintains a searchable local amendment database. Cities also set their own fee schedules, zoning setbacks, fence heights and review timelines.

Nearby counties