Permit engine

Do you need a permit for tub to shower conversion in West Palm Beach, FL?

Permit requirements, Palm Beach County fees, required inspections and the exact documents West Palm Beach asks for.

Verified August 2026

Tub to Shower Conversion permit in West Palm Beach

Usually yes

In most cases yes — Palm Beach County and the City of West Palm Beach generally require a permit for tub to shower conversion. Height, size and location on the lot determine the exact review, so confirm with the building department before you start.

Permit facts

JurisdictionWest Palm Beach, Palm Beach County
Permit fee estimate$110 – $390
Who can pull itLicensed contractor
Owner-builderAllowed on owner-occupied homes
InspectionsPlumbing rough-in, Shower pan water test, Final inspection
Typical timeline3-7 days of work, 2-5 weeks including permitting

Documents to submit

  • Plumbing permit application
  • Contractor license and insurance

How to apply in West Palm Beach

  1. 1. Confirm scope with the West Palm Beach building department — exemptions vary by scope, not project type.
  2. 2. Prepare the documents above, including product approvals where wind-borne debris rules apply.
  3. 3. Submit through the West Palm Beach permit portal and pay the review fee.
  4. 4. Schedule each required inspection as the work reaches that stage.
  5. 5. Get the final inspection signed off — an open permit blocks the sale of the home.

What happens if you skip the permit

Unpermitted work commonly triggers double permit fees, a code enforcement lien, forced exposure of concealed work, insurance claim denial, and a failed disclosure at closing. Retroactive permits are possible but cost more and can require tearing out finished work.

Frequently asked questions

Do I need a permit to convert a tub to a shower?

Usually yes. Moving or replacing the drain and valve is regulated plumbing work, so most Florida building departments require a plumbing permit and a shower pan water test.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.