Maryland pricing
Furnace Replacement Cost Calculator — Maryland
Estimate what a furnace replacement should cost by output, efficiency and venting work. Every figure below is already adjusted for Maryland labor and material pricing.
Model reviewed August 2026
Does furnace replacement cost cost more in Maryland?
+12% versus the national baseline
Installed prices in Maryland run about 12% above the national baseline. Permit fees are about 10% higher than the national average. Homeowner permits allowed on owner-occupied property.
Chesapeake Bay Critical Area rules add impervious-surface and buffer review to driveways, decks and additions within 1,000 feet of tidal water.
Compare with the national average furnace replacement cost calculator.
Estimated installed cost
$5,238 – $7,441
- Furnace and labor
- $5,376
- Venting work
- $0
- Removal and permit
- $577
Estimates only. Local pricing, site conditions and code requirements change the real number.
What changes the number in Maryland
| Local cost indexAbove the national baseline | 1.12x national |
|---|---|
| Permit fee index | 1.10x national |
| Code basisStatewide code applies | Maryland Building Performance Standards, based on the IRC |
| Owner-builder posture | Homeowner permits allowed on owner-occupied property |
| Largest markets | Baltimore, Columbia, Silver Spring, Frederick |
The formula
Cost = base unit cost x efficiency multiplier + venting + removal + permit
High-efficiency condensing furnaces (90%+ AFUE) need new PVC venting and a condensate drain, which is why the jump from 80% to 96% AFUE costs more than the equipment difference alone.
Covered markets in Maryland
City-level cost and permit pages with local building department links.
Frequently asked questions
How much is a new furnace installed?
Most homeowners pay $4,000 to $8,500 for a replacement gas furnace in 2026. Electric furnaces are cheaper to install but cost far more to run.
How long does a furnace last?
15 to 20 years for a gas furnace with annual service. Past year 15, repairs over about $1,500 usually favor replacement.
Sources
Sources & verification
- Maryland Department of Labor
- ENERGY STAR sizing and efficiency guidance
- ACCA Manual J / Manual S sizing standards
- AHRI equipment performance directory
- International Code Council (IRC/IBC)
Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.
