Furnace Replacement Cost Calculator — New Jersey

Estimate what a furnace replacement should cost by output, efficiency and venting work. Every figure below is already adjusted for New Jersey labor and material pricing.

Verified August 2026

Does furnace replacement cost cost more in New Jersey?

+21% versus the national baseline

The UCC's subcode structure means one project can require separate building, electrical, plumbing and fire subcode permits, each with its own fee and inspector. Permit fees here run about 25% off the national average, and Homeowner permits allowed on owner-occupied one- and two-family homes

Estimated installed cost

$5,659 – $8,039

Furnace and labor
$5,808
Venting work
$0
Removal and permit
$623

Estimates only. Local pricing, site conditions and code requirements change the real number.

What changes the number in New Jersey

Local cost indexAbove the national baseline1.21x national
Permit fee index1.25x national
Code basisStatewide code appliesNew Jersey Uniform Construction Code, based on the IRC
Owner-builder postureHomeowner permits allowed on owner-occupied one- and two-family homes
Largest marketsNewark, Jersey City, Paterson, Trenton

The formula

Cost = base unit cost x efficiency multiplier + venting + removal + permit

High-efficiency condensing furnaces (90%+ AFUE) need new PVC venting and a condensate drain, which is why the jump from 80% to 96% AFUE costs more than the equipment difference alone.

Frequently asked questions

How much is a new furnace installed?

Most homeowners pay $4,000 to $8,500 for a replacement gas furnace in 2026. Electric furnaces are cheaper to install but cost far more to run.

How long does a furnace last?

15 to 20 years for a gas furnace with annual service. Past year 15, repairs over about $1,500 usually favor replacement.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.