Dock Construction cost in Albuquerque, NM

Albuquerque, NM · updated August 2026

$24,500

Typical local cost

$8,500 – $80,000

Typical range

per sq ft of dock
$50 – $150

Installed, local pricing

Permit
Yes

$335 – $1,920 in fees

Typical timeline
2-5 weeks of work

2-5 weeks of work, 4-12 months including environmental review

Calculate my dock cost

Albuquerque runs -6% against the U.S. average · data confidence Medium · modeled estimate, not a quote

The modeled midpoint for Albuquerque is $24,500. The local adjustment for this trade is x0.941 — driven mainly by Bernalillo County labor rates and 90% exposure to local code requirements.

Estimate your Albuquerque job

Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.

Deck area

320 sq ft

Decking (linear feet)
696 lf
16 ft boards needed
44 boards
Joists
16 at 16" o.c.
Footings
8
Installed cost estimate
$11,518 – $18,293

Priced for Albuquerque (local adjustment x0.941).

Estimates only. Local pricing, site conditions and code requirements change the real number.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
150 sq ft of dock$7,500 – $22,500
200 sq ft of dock$10,000 – $30,000
250 sq ft of dock$12,500 – $37,500
325 sq ft of dock$16,300 – $48,800
425 sq ft of dock$21,300 – $63,800

Based on Albuquerque pricing of $50–$150 per sq ft of dock.

Where the money goes

Labor
$14,700
57% of median
Materials
$9,800
38% of median
Permit & fees
$1,130
4% of median

Albuquerque project costs-6% vs U.S. average

Based on Bernalillo County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Albuquerque building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    2-5 weeks of work, 4-12 months including environmental review

  5. 05

    Inspection

    Piling inspection, Framing inspection, Electrical inspection for dock power, Final inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Albuquerque labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$70–$91

Waterfront crews in Bernalillo County · -9% vs U.S. ($88/hr)

Typical crew

4 × 5.5 days

On-site time for a typical dock job here.

Labor in the price

$14,700

60% of the median — the rest is material, disposal and permit.

Because labor is 60% of this job, Albuquerque wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national waterfront crew rates adjusted by the Bernalillo County labor factor (x0.909). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Albuquerque differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$1,425Material and delivery$400Code and inspection load$300Permit fees$50
Dollars of the Albuquerque difference owned by each driver, versus the U.S. median for dock construction.
  • Trade labor rates-$1,425

    Bernalillo County crews price 9% below the national average, and labor is 60% of this job.

  • Material and delivery-$400

    Materials are nationally traded, so they move less — but delivery into this market runs 4% under baseline.

  • Code and inspection load+$300

    Dock Construction carries 90% exposure to local code requirements, and this jurisdiction's review load indexes at x1.01.

  • Permit fees-$50

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

Basis: Decomposition of the modeled Albuquerque median against the U.S. median for this scope. · City of Albuquerque building department, Hometriva methodology

Albuquerque vs New Mexico vs the U.S.

Albuquerque$8,500–$80,000New Mexico average$8,600–$80,900U.S. average$9,000–$85,000
Modeled ranges for dock construction. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated dock construction in Albuquerque

$25,630

Likely range $9,630 – $81,130

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Dock square footage and walkway length
  • Water depth and piling count
  • Boat lift capacity
  • Decking material: pressure-treated, composite or Ipe
  • Seagrass surveys and mitigation requirements

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Albuquerque building departmentModeled estimate
electricalCity of Albuquerque building departmentModeled estimate
mechanicalCity of Albuquerque building departmentModeled estimate
plumbingCity of Albuquerque building departmentModeled estimate
zoningCity of Albuquerque building departmentModeled estimate
fireCity of Albuquerque building departmentModeled estimate

Permit requirement in Albuquerque

Yes — a permit is required for dock construction in Albuquerque, NM. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Permitting authority
City of Albuquerque building departmentModeled estimate
Permit fee
Estimated allowance $335–$1,920Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Piling inspection
  2. Framing inspection
  3. Electrical inspection for dock power
  4. Final inspection
Full Albuquerque permit guide for dock construction →

Local conditions that change this job

Only the exposures that materially affect dock construction.

Coastal / salt-air exposure

Minimal0/100

Named-storm exposure

Low22/100

Flood zone exposure

Low30/100

Nearby market comparison

MarketLocal factorMedianPer sq ft of dock
Albuquerque (this page)x0.941$24,500$50 – $150
Rio Ranchox0.952$24,800$50 – $150
Santa Fex0.952$24,800$50 – $150
Farmingtonx0.909$23,600$50 – $150
+ Had dock construction done in Albuquerque? Add what you paid or were quoted

Reports are reviewed before they count, and nothing is published until at least 5 reports exist for a market. No name, email or address is collected.

No name, email or address is collected. Reports are reviewed before they count.
No name, email or address is collected.

How Hometriva estimates Albuquerque dock costs

Hometriva does not publish invented city prices. The Albuquerque estimate for dock construction is produced by this chain, and every input is stored separately:

  1. National baseline$26,000

    Typical U.S. cost for dock construction on a single-family home.

  2. Local labor factorx0.909

    Albuquerque-area trade labor rates, weighted at 60% of this job.

  3. Material factorx0.962

    Material and delivery pricing into Bernalillo County, weighted at 40%.

  4. Regulatory factorx1.013

    Local code, product-approval and inspection load, applied at 90% for this project type.

  5. Applied multiplierx0.941

    Blended Albuquerque adjustment specific to dock construction.

  6. Permit component$335 – $1,920

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, dock construction in Albuquerque carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for dock construction pricing in Albuquerque, NM.

  • • National unit-cost baselines against current trade pricing
  • • Local labor and materials factors for the market
  • • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

Do I need a permit for dock construction in Albuquerque, NM?

In most jurisdictions this work is permitted and inspected. Requirements are set locally, so confirm the current application and inspection checklist with your building department before work starts.

How long does dock construction take?

2-5 weeks of work, 4-12 months including environmental review. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are dock square footage and walkway length; water depth and piling count; boat lift capacity.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.

Related pages