Electrical Panel Replacement cost in Franklin, TN

Franklin, TN · updated August 2026

$3,100

Typical local cost

$1,700 – $6,200

Typical range

per panel upgrade
$1,700 – $6,150

Installed, local pricing

Permit
Yes

$85 – $325 in fees

Typical timeline
1 day of work

1 day of work, 1-4 weeks including utility coordination

Franklin runs -9% against the U.S. average · data confidence Medium · modeled estimate, not a quote

The modeled midpoint for Franklin is $3,100. The local adjustment for this trade is x0.905 — driven mainly by Williamson County labor rates and 65% exposure to local code requirements.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
100-amp panel$1,400$5,000
150-amp panel$1,600$5,900
200-amp panel$1,900$6,800
400-amp service$2,900$10,500

Based on Franklin pricing of $1,700–$6,150 per panel upgrade.

Cost by service scenario

Panel work is not one project. Swapping a panel on an existing service is a different job from raising the service capacity with the utility involved. Every row is priced against the Franklin median.

ScopeWhat it includesTypical installed cost
Like-for-like panel replacementSame amperage, existing service and meter reused$1,700$2,500
100A → 150A upgradeNew panel and breakers, service conductors evaluated$2,500$3,400
100A → 200A service upgradeNew panel, meter base, grounding and utility reconnect$3,100$4,300
200A upgrade with mast/service entrance workNew riser or weatherhead, exterior conductors replaced$4,000$5,600
400A serviceLarge home, dual panels or subpanel feed$5,900$8,400
  • The utility, not the electrician, controls the disconnect and reconnect window — schedule slippage here is the usual cause of a two-day job becoming a week.
  • Meter base replacement, grounding electrode upgrades and bonding to water and gas are routinely quoted separately; ask for them line by line.
  • Federal Pacific, Zinsco and fuse panels are commonly flagged by insurers and four-point inspections, which is why many replacements are not optional.
  • Overhead-to-underground conversions add trenching and are priced by the foot.
  • If an EV charger, heat pump or solar is coming, size the service for it now — the second trip repeats the permit, the inspection and the utility coordination.

Basis: Each scope is priced as a multiple of the modeled Franklin median for electrical panel replacement, so the scenarios, the size table and the calculator always agree. · Hometriva methodology

Where the money goes

Labor
$1,900
57% of median
Materials
$1,200
36% of median
Permit & fees
$205
6% of median

Franklin project costs-9% vs U.S. average

Based on Williamson County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Franklin building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    1 day of work, 1-4 weeks including utility coordination

  5. 05

    Inspection

    Utility disconnect coordination, Rough electrical, Final electrical inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Franklin labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$77–$99

Electrical crews in Williamson County · -13% vs U.S. ($100/hr)

Typical crew

2 × 1.5 days

On-site time for a typical panel job here.

Labor in the price

$1,900

60% of the median — the rest is material, disposal and permit.

Because labor is 60% of this job, Franklin wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national electrical crew rates adjusted by the Williamson County labor factor (x0.870). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Franklin differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$275Material and delivery$50Permit fees$25
Dollars of the Franklin difference owned by each driver, versus the U.S. median for electrical panel replacement.
  • Trade labor rates-$275

    Williamson County crews price 13% below the national average, and labor is 60% of this job.

  • Material and delivery-$50

    Materials are nationally traded, so they move less — but delivery into this market runs 4% under baseline.

  • Permit fees-$25

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

Basis: Decomposition of the modeled Franklin median against the U.S. median for this scope. · City of Franklin building department, Hometriva methodology

Franklin vs Tennessee vs the U.S.

Franklin$1,700$6,200Tennessee average$1,700$6,200U.S. average$1,900$6,800
Modeled ranges for electrical panel replacement. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated electrical panel replacement in Franklin

$3,305

Likely range $1,905$6,405

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Service size: 100A, 150A or 200A
  • Meter can and service entrance conductor replacement
  • Overhead versus underground service
  • Surge protection and AFCI/GFCI breaker requirements
  • Utility disconnect and reconnect scheduling

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Franklin building departmentModeled estimate
electricalCity of Franklin building departmentModeled estimate
mechanicalCity of Franklin building departmentModeled estimate
plumbingCity of Franklin building departmentModeled estimate
zoningCity of Franklin building departmentModeled estimate
fireCity of Franklin building departmentModeled estimate

Permit requirement in Franklin

Yes — a permit is required for electrical panel replacement in Franklin, TN. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Permitting authority
City of Franklin building departmentModeled estimate
Permit fee
Estimated allowance $85$325Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Utility disconnect coordination
  2. Rough electrical
  3. Final electrical inspection
Full Franklin permit guide for electrical panel replacement

Local conditions that change this job

Only the exposures that materially affect electrical panel replacement.

Named-storm exposure

High70/100

Flood zone exposure

Moderate50/100

Coastal / salt-air exposure

Moderate45/100

Owner-occupied homes

0%

Owner-occupied share of the housing stock, which drives how much of this work is homeowner-funded versus landlord-funded.

Households in market

34,000

Approximate household count in Franklin, used to size the contractor pool for this trade.

Permit activity index

x0.85

Relative permit volume and fee load versus the national baseline.

Nearby market comparison

MarketLocal factorMedianPer panel upgrade
Franklin (this page)x0.905$3,100$1,700$6,150
Nashvillex1.034$3,500$1,950$7,050
Murfreesborox0.930$3,200$1,750$6,300
Clarksvillex0.930$3,200$1,750$6,300

What Franklin homeowners actually paid

Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Franklin

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Franklin panel costs

Hometriva does not publish invented city prices. The Franklin estimate for electrical panel replacement is produced by this chain, and every input is stored separately:

  1. National baseline$3,400

    Typical U.S. cost for electrical panel replacement on a single-family home.

  2. Local labor factorx0.870

    Franklin-area trade labor rates, weighted at 60% of this job.

  3. Material factorx0.960

    Material and delivery pricing into Williamson County, weighted at 40%.

  4. Regulatory factorx0.998

    Local code, product-approval and inspection load, applied at 65% for this project type.

  5. Applied multiplierx0.905

    Blended Franklin adjustment specific to electrical panel replacement.

  6. Permit component$85 – $325

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, electrical panel replacement in Franklin carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for electrical panel replacement pricing in Franklin, TN.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

How long does a panel upgrade take?

The physical work is usually one day with power off for 4-8 hours. Utility disconnect scheduling and inspection generally stretch the total to one to four weeks.

Do I need a permit for electrical panel replacement in Franklin, TN?

In most jurisdictions this work is permitted and inspected. Requirements are set locally, so confirm the current application and inspection checklist with your building department before work starts.

How long does electrical panel replacement take?

1 day of work, 1-4 weeks including utility coordination. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are service size: 100a, 150a or 200a; meter can and service entrance conductor replacement; overhead versus underground service.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.

Related pages