Electrical Panel Replacement cost in Round Rock, TX

Round Rock, TX · updated August 2026

$3,300

Typical local cost

$1,800 – $6,600

Typical range

per panel upgrade
$1,850 – $6,600

Installed, local pricing

Permit
Yes

$95 – $360 in fees

Typical timeline
1 day of work

1 day of work, 1-4 weeks including utility coordination

Round Rock runs -3% against the U.S. average · data confidence Medium · modeled estimate, not a quote

Most Round Rock homeowners pay around $3,300. The local adjustment for this trade is x0.973 — driven mainly by Williamson County labor rates and 65% exposure to local code requirements.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
1 panel upgrade$1,900$6,600
1 panel upgrade$1,900$6,600
1 panel upgrade$1,900$6,600
1 panel upgrade$1,900$6,600
1 panel upgrade$1,900$6,600

Based on Round Rock pricing of $1,850–$6,600 per panel upgrade.

Cost by service scenario

Panel work is not one project. Swapping a panel on an existing service is a different job from raising the service capacity with the utility involved. Every row is priced against the Round Rock median.

ScopeWhat it includesTypical installed cost
Like-for-like panel replacementSame amperage, existing service and meter reused$1,800$2,600
100A → 150A upgradeNew panel and breakers, service conductors evaluated$2,600$3,600
100A → 200A service upgradeNew panel, meter base, grounding and utility reconnect$3,300$4,600
200A upgrade with mast/service entrance workNew riser or weatherhead, exterior conductors replaced$4,300$5,900
400A serviceLarge home, dual panels or subpanel feed$6,300$8,900
  • The utility, not the electrician, controls the disconnect and reconnect window — schedule slippage here is the usual cause of a two-day job becoming a week.
  • Meter base replacement, grounding electrode upgrades and bonding to water and gas are routinely quoted separately; ask for them line by line.
  • Federal Pacific, Zinsco and fuse panels are commonly flagged by insurers and four-point inspections, which is why many replacements are not optional.
  • Overhead-to-underground conversions add trenching and are priced by the foot.
  • If an EV charger, heat pump or solar is coming, size the service for it now — the second trip repeats the permit, the inspection and the utility coordination.

Basis: Each scope is priced as a multiple of the modeled Round Rock median for electrical panel replacement, so the scenarios, the size table and the calculator always agree. · Hometriva methodology

Where the money goes

Labor
$2,000
57% of median
Materials
$1,300
37% of median
Permit & fees
$230
7% of median

Round Rock project costs-3% vs U.S. average

Based on Williamson County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Round Rock building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    1 day of work, 1-4 weeks including utility coordination

  5. 05

    Inspection

    Utility disconnect coordination, Rough electrical, Final electrical inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Round Rock labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$82–$107

Electrical crews in Williamson County · -6% vs U.S. ($100/hr)

Typical crew

2 × 1.5 days

On-site time for a typical panel job here.

Labor in the price

$2,000

60% of the median — the rest is material, disposal and permit.

Because labor is 60% of this job, Round Rock wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national electrical crew rates adjusted by the Williamson County labor factor (x0.935). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Round Rock differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$125Code and inspection load$50
Dollars of the Round Rock difference owned by each driver, versus the U.S. median for electrical panel replacement.
  • Trade labor rates-$125

    Williamson County crews price 6% below the national average, and labor is 60% of this job.

  • Code and inspection load+$50

    Electrical Panel Replacement carries 65% exposure to local code requirements, and this jurisdiction's review load indexes at x1.03.

Basis: Decomposition of the modeled Round Rock median against the U.S. median for this scope. · City of Round Rock building department, Hometriva methodology

Round Rock vs Texas vs the U.S.

Round Rock$1,800$6,600Texas average$1,800$6,600U.S. average$1,900$6,800
Modeled ranges for electrical panel replacement. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated electrical panel replacement in Round Rock

$3,530

Likely range $2,030$6,830

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Service size: 100A, 150A or 200A
  • Meter can and service entrance conductor replacement
  • Overhead versus underground service
  • Surge protection and AFCI/GFCI breaker requirements
  • Utility disconnect and reconnect scheduling

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Round Rock building departmentModeled estimate
electricalCity of Round Rock building departmentModeled estimate
mechanicalCity of Round Rock building departmentModeled estimate
plumbingCity of Round Rock building departmentModeled estimate
zoningCity of Round Rock building departmentModeled estimate
fireCity of Round Rock building departmentModeled estimate

Permit requirement in Round Rock

Yes — a permit is required for electrical panel replacement in Round Rock, TX. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Permitting authority
City of Round Rock building departmentModeled estimate
Permit fee
Estimated allowance $95$360Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Utility disconnect coordination
  2. Rough electrical
  3. Final electrical inspection
Full Round Rock permit guide for electrical panel replacement

Local conditions that change this job

Only the exposures that materially affect electrical panel replacement.

Named-storm exposure

High70/100

Flood zone exposure

Moderate50/100

Coastal / salt-air exposure

Moderate45/100

Round Rock sits in Williamson County, Texas. Hail and high straight-line winds are the dominant loss driver, so impact-rated roofing and insurance-funded replacement shape local pricing. Work outside city limits is permitted by the county building department rather than the city.

Owner-occupied homes

0%

Owner-occupied share of the housing stock, which drives how much of this work is homeowner-funded versus landlord-funded.

Households in market

50,572

Approximate household count in Round Rock, used to size the contractor pool for this trade.

Permit activity index

x0.95

Relative permit volume and fee load versus the national baseline.

Nearby market comparison

MarketLocal factorMedianPer panel upgrade
Round Rock (this page)x0.973$3,300$1,850$6,600
El Pasox1.027$3,500$1,950$7,000
Arlingtonx1.027$3,500$1,950$7,000
Corpus Christix0.999$3,400$1,900$6,800

What Round Rock homeowners actually paid

Real reported invoices from this market, aggregated. Add yours — it takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Round Rock

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Round Rock panel costs

Hometriva does not publish invented city prices. The Round Rock estimate for electrical panel replacement is produced by this chain, and every input is stored separately:

  1. National baseline$3,400

    Typical U.S. cost for electrical panel replacement on a single-family home.

  2. Local labor factorx0.935

    Round Rock-area trade labor rates, weighted at 60% of this job.

  3. Material factorx0.988

    Material and delivery pricing into Williamson County, weighted at 40%.

  4. Regulatory factorx1.027

    Local code, product-approval and inspection load, applied at 65% for this project type.

  5. Applied multiplierx0.973

    Blended Round Rock adjustment specific to electrical panel replacement.

  6. Permit component$95 – $360

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, electrical panel replacement in Round Rock carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for electrical panel replacement pricing in Round Rock, TX.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

Do I need a permit to replace an electrical panel?

Yes, always. An electrical permit is required, a licensed electrical contractor must perform the work in most Florida jurisdictions, and the utility will not reconnect service until the final inspection passes.

How long does a panel upgrade take?

The physical work is usually one day with power off for 4-8 hours. Utility disconnect scheduling and inspection generally stretch the total to one to four weeks.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.

Related pages