EV Charger Installation cost in Coeur d'Alene, ID

Coeur d'Alene, ID · updated August 2026

$1,500

Typical local cost

$700 – $3,900

Typical range

per Level 2 charger installed
$750 – $3,900

Installed, local pricing

Permit
Yes

$65 – $210 in fees

Typical timeline
Half a day of work

Half a day of work, 1-3 weeks including permit and inspection

Coeur d'Alene runs -7% against the U.S. average · data confidence Medium · modeled estimate, not a quote

The modeled midpoint for Coeur d'Alene is $1,500. The local adjustment for this trade is x0.932 — driven mainly by Kootenai County labor rates and 55% exposure to local code requirements.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
Short run (under 25 ft)$500$2,900
Standard run (25–50 ft)$700$3,900
Long run (50–100 ft)$1,000$5,500
Run plus panel capacity work$1,300$7,000

Based on Coeur d'Alene pricing of $750–$3,900 per level 2 charger installed.

Where the money goes

Labor
$900
55% of median
Materials
$600
37% of median
Permit & fees
$140
9% of median

Coeur d'Alene project costs-7% vs U.S. average

Based on Kootenai County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Coeur d'Alene building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    Half a day of work, 1-3 weeks including permit and inspection

  5. 05

    Inspection

    Electrical rough where concealed, Final electrical inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Coeur d'Alene labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$80–$104

Electrical crews in Kootenai County · -9% vs U.S. ($100/hr)

Typical crew

2 × 0.5 days

On-site time for a typical ev charger job here.

Labor in the price

$900

60% of the median — the rest is material, disposal and permit.

Because labor is 60% of this job, Coeur d'Alene wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national electrical crew rates adjusted by the Kootenai County labor factor (x0.909). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Coeur d'Alene differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$100Permit fees$25
Dollars of the Coeur d'Alene difference owned by each driver, versus the U.S. median for ev charger installation.
  • Trade labor rates-$100

    Kootenai County crews price 9% below the national average, and labor is 60% of this job.

  • Permit fees-$25

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

Basis: Decomposition of the modeled Coeur d'Alene median against the U.S. median for this scope. · City of Coeur d'Alene building department, Hometriva methodology

Coeur d'Alene vs Idaho vs the U.S.

Coeur d'Alene$700$3,900Idaho average$800$4,100U.S. average$800$4,200
Modeled ranges for ev charger installation. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated ev charger installation in Coeur d'Alene

$1,640

Likely range $840$4,040

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Distance from the panel to the charger
  • Available panel capacity and any needed upgrade
  • Hardwired versus NEMA 14-50 outlet
  • Trenching for detached garages

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Coeur d'Alene building departmentModeled estimate
electricalCity of Coeur d'Alene building departmentModeled estimate
mechanicalCity of Coeur d'Alene building departmentModeled estimate
plumbingCity of Coeur d'Alene building departmentModeled estimate
zoningCity of Coeur d'Alene building departmentModeled estimate
fireCity of Coeur d'Alene building departmentModeled estimate

Permit requirement in Coeur d'Alene

Yes — a permit is required for ev charger installation in Coeur d'Alene, ID. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Permitting authority
City of Coeur d'Alene building departmentModeled estimate
Permit fee
Estimated allowance $65$210Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Electrical rough where concealed
  2. Final electrical inspection
Full Coeur d'Alene permit guide for ev charger installation

Local conditions that change this job

Only the exposures that materially affect ev charger installation.

Humidity

Severe84/100

Nearby market comparison

MarketLocal factorMedianPer Level 2 charger installed
Coeur d'Alene (this page)x0.932$1,500$750$3,900
Spokanex1.072$1,800$850$4,500
Kalispellx0.972$1,600$800$4,100
Missoulax1.010$1,700$800$4,250

What Coeur d'Alene homeowners actually paid

Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Coeur d'Alene

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Coeur d'Alene ev charger costs

Hometriva does not publish invented city prices. The Coeur d'Alene estimate for ev charger installation is produced by this chain, and every input is stored separately:

  1. National baseline$1,650

    Typical U.S. cost for ev charger installation on a single-family home.

  2. Local labor factorx0.909

    Coeur d'Alene-area trade labor rates, weighted at 60% of this job.

  3. Material factorx0.977

    Material and delivery pricing into Kootenai County, weighted at 40%.

  4. Regulatory factorx0.992

    Local code, product-approval and inspection load, applied at 55% for this project type.

  5. Applied multiplierx0.932

    Blended Coeur d'Alene adjustment specific to ev charger installation.

  6. Permit component$65 – $210

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, ev charger installation in Coeur d'Alene carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for ev charger installation pricing in Coeur d'Alene, ID.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

Do I need a permit for ev charger installation in Coeur d'Alene, ID?

In most jurisdictions this work is permitted and inspected. Requirements are set locally, so confirm the current application and inspection checklist with your building department before work starts.

How long does ev charger installation take?

Half a day of work, 1-3 weeks including permit and inspection. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are distance from the panel to the charger; available panel capacity and any needed upgrade; hardwired versus nema 14-50 outlet.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.