EV Charger Installation cost in Camden, NJ

Camden, NJ · updated August 2026

$2,100

Typical local cost

$1,000 – $5,400

Typical range

per Level 2 charger installed
$1,050 – $5,450

Installed, local pricing

Permit
Yes

$100 – $315 in fees

Typical timeline
Half a day of work

Half a day of work, 1-3 weeks including permit and inspection

Camden runs +29% against the U.S. average · data confidence Medium · modeled estimate, not a quote

Most Camden homeowners pay around $2,100. The local adjustment for this trade is x1.294 — driven mainly by Camden County labor rates and 55% exposure to local code requirements.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
1 Level 2 charger installed$1,100$5,500
1 Level 2 charger installed$1,100$5,500
1 Level 2 charger installed$1,100$5,500
1 Level 2 charger installed$1,100$5,500
1 Level 2 charger installed$1,100$5,500

Based on Camden pricing of $1,050–$5,450 per level 2 charger installed.

Where the money goes

Labor
$1,300
56% of median
Materials
$800
35% of median
Permit & fees
$210
9% of median

Camden project costs+29% vs U.S. average

Based on Camden County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Camden building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    Half a day of work, 1-3 weeks including permit and inspection

  5. 05

    Inspection

    Electrical rough where concealed, Final electrical inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Camden labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$112–$145

Electrical crews in Camden County · +27% vs U.S. ($100/hr)

Typical crew

2 × 0.5 days

On-site time for a typical ev charger job here.

Labor in the price

$1,300

60% of the median — the rest is material, disposal and permit.

Because labor is 60% of this job, Camden wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national electrical crew rates adjusted by the Camden County labor factor (x1.273). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Camden differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$275Code and inspection load$100Material and delivery$100Permit fees$50
Dollars of the Camden difference owned by each driver, versus the U.S. median for ev charger installation.
  • Trade labor rates+$275

    Camden County crews price 27% above the national average, and labor is 60% of this job.

  • Code and inspection load+$100

    EV Charger Installation carries 55% exposure to local code requirements, and this jurisdiction's review load indexes at x1.11.

  • Material and delivery+$100

    Materials are nationally traded, so they move less — but delivery into this market runs 13% over baseline.

  • Permit fees+$50

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

Basis: Decomposition of the modeled Camden median against the U.S. median for this scope. · City of Camden building department, Hometriva methodology

Camden vs New Jersey vs the U.S.

Camden$1,000$5,400New Jersey average$1,000$5,400U.S. average$800$4,200
Modeled ranges for ev charger installation. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated ev charger installation in Camden

$2,310

Likely range $1,210$5,610

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Distance from the panel to the charger
  • Available panel capacity and any needed upgrade
  • Hardwired versus NEMA 14-50 outlet
  • Trenching for detached garages

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Camden building departmentModeled estimate
electricalCity of Camden building departmentModeled estimate
mechanicalCity of Camden building departmentModeled estimate
plumbingCity of Camden building departmentModeled estimate
zoningCity of Camden building departmentModeled estimate
fireCity of Camden building departmentModeled estimate

Permit requirement in Camden

Yes — a permit is required for ev charger installation in Camden, NJ. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Permitting authority
City of Camden building departmentModeled estimate
Permit fee
Estimated allowance $100$315Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Electrical rough where concealed
  2. Final electrical inspection
Full Camden permit guide for ev charger installation

Local conditions that change this job

Only the exposures that materially affect ev charger installation.

Humidity

Severe84/100

Camden sits in Camden County, New Jersey. Deep frost lines, snow load and a very old housing stock mean permits frequently touch structural, electrical and energy-code upgrades at once. Work outside city limits is permitted by the county building department rather than the city.

Nearby market comparison

MarketLocal factorMedianPer Level 2 charger installed
Camden (this page)x1.294$2,100$1,050$5,450
Jersey Cityx1.321$2,200$1,050$5,550
Patersonx1.321$2,200$1,050$5,550
Elizabethx1.294$2,100$1,050$5,450

What Camden homeowners actually paid

Real reported invoices from this market, aggregated. Add yours — it takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Camden

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Camden ev charger costs

Hometriva does not publish invented city prices. The Camden estimate for ev charger installation is produced by this chain, and every input is stored separately:

  1. National baseline$1,650

    Typical U.S. cost for ev charger installation on a single-family home.

  2. Local labor factorx1.273

    Camden-area trade labor rates, weighted at 60% of this job.

  3. Material factorx1.133

    Material and delivery pricing into Camden County, weighted at 40%.

  4. Regulatory factorx1.115

    Local code, product-approval and inspection load, applied at 55% for this project type.

  5. Applied multiplierx1.294

    Blended Camden adjustment specific to ev charger installation.

  6. Permit component$100 – $315

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, ev charger installation in Camden carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for ev charger installation pricing in Camden, NJ.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

Do I need a permit for an EV charger?

Yes. Adding a dedicated 240V circuit requires an electrical permit and inspection in Florida jurisdictions, and most require a licensed electrical contractor.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.

Related pages