EV Charger Installation cost in Salt Lake City, UT

Salt Lake City, UT · updated August 2026

$1,800

Typical local cost

$900 – $4,500

Typical range

per Level 2 charger installed
$850 – $4,500

Installed, local pricing

Permit
Yes

$85 – $265 in fees

Typical timeline
Half a day of work

Half a day of work, 1-3 weeks including permit and inspection

Salt Lake City runs +7% against the U.S. average · data confidence Medium · modeled estimate, not a quote

Most Salt Lake City homeowners pay around $1,800. The local adjustment for this trade is x1.066 — driven mainly by Salt Lake County labor rates and 55% exposure to local code requirements.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
1 Level 2 charger installed$900$4,500
1 Level 2 charger installed$900$4,500
1 Level 2 charger installed$900$4,500
1 Level 2 charger installed$900$4,500
1 Level 2 charger installed$900$4,500

Based on Salt Lake City pricing of $850–$4,500 per level 2 charger installed.

Where the money goes

Labor
$1,100
56% of median
Materials
$700
35% of median
Permit & fees
$175
9% of median

Salt Lake City project costs+7% vs U.S. average

Based on Salt Lake County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Salt Lake City building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    Half a day of work, 1-3 weeks including permit and inspection

  5. 05

    Inspection

    Electrical rough where concealed, Final electrical inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Salt Lake City labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$93–$120

Electrical crews in Salt Lake County · +5% vs U.S. ($100/hr)

Typical crew

2 × 0.5 days

On-site time for a typical ev charger job here.

Labor in the price

$1,100

60% of the median — the rest is material, disposal and permit.

Because labor is 60% of this job, Salt Lake City wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national electrical crew rates adjusted by the Salt Lake County labor factor (x1.052). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Salt Lake City differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$50Code and inspection load$50
Dollars of the Salt Lake City difference owned by each driver, versus the U.S. median for ev charger installation.
  • Trade labor rates+$50

    Salt Lake County crews price 5% above the national average, and labor is 60% of this job.

  • Code and inspection load+$50

    EV Charger Installation carries 55% exposure to local code requirements, and this jurisdiction's review load indexes at x1.05.

Basis: Decomposition of the modeled Salt Lake City median against the U.S. median for this scope. · City of Salt Lake City building department, Hometriva methodology

Salt Lake City vs Utah vs the U.S.

Salt Lake City$900$4,500Utah average$800$4,100U.S. average$800$4,200
Modeled ranges for ev charger installation. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated ev charger installation in Salt Lake City

$1,975

Likely range $1,075$4,675

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Distance from the panel to the charger
  • Available panel capacity and any needed upgrade
  • Hardwired versus NEMA 14-50 outlet
  • Trenching for detached garages

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Salt Lake City building departmentModeled estimate
electricalCity of Salt Lake City building departmentModeled estimate
mechanicalCity of Salt Lake City building departmentModeled estimate
plumbingCity of Salt Lake City building departmentModeled estimate
zoningCity of Salt Lake City building departmentModeled estimate
fireCity of Salt Lake City building departmentModeled estimate

Permit requirement in Salt Lake City

Yes — a permit is required for ev charger installation in Salt Lake City, UT. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Permitting authority
City of Salt Lake City building departmentModeled estimate
Permit fee
Estimated allowance $85$265Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Electrical rough where concealed
  2. Final electrical inspection
Full Salt Lake City permit guide for ev charger installation

Local conditions that change this job

Only the exposures that materially affect ev charger installation.

Humidity

Low26/100

Snow load, freeze-thaw and a very dry summer make the roofing, insulation and irrigation specifications diverge sharply from Sun Belt markets.

Nearby market comparison

MarketLocal factorMedianPer Level 2 charger installed
Salt Lake City (this page)x1.066$1,800$850$4,500
Denverx1.166$1,900$950$4,900
Boisex1.017$1,700$800$4,250
Renox1.082$1,800$850$4,550

What Salt Lake City homeowners actually paid

Real reported invoices from this market, aggregated. Add yours — it takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Salt Lake City

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Salt Lake City ev charger costs

Hometriva does not publish invented city prices. The Salt Lake City estimate for ev charger installation is produced by this chain, and every input is stored separately:

  1. National baseline$1,650

    Typical U.S. cost for ev charger installation on a single-family home.

  2. Local labor factorx1.052

    Salt Lake City-area trade labor rates, weighted at 60% of this job.

  3. Material factorx1.022

    Material and delivery pricing into Salt Lake County, weighted at 40%.

  4. Regulatory factorx1.046

    Local code, product-approval and inspection load, applied at 55% for this project type.

  5. Applied multiplierx1.066

    Blended Salt Lake City adjustment specific to ev charger installation.

  6. Permit component$85 – $265

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, ev charger installation in Salt Lake City carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for ev charger installation pricing in Salt Lake City, UT.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

Do I need a permit for an EV charger?

Yes. Adding a dedicated 240V circuit requires an electrical permit and inspection in Florida jurisdictions, and most require a licensed electrical contractor.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.

Related pages