Pool Installation cost in Fort Lauderdale, FL
Fort Lauderdale, FL · updated August 2026
$78,700
Typical local cost
$48,200 – $145,900
Typical range
- per in-ground gunite pool
- $48,200 – $145,950
- Permit
- Yes
- Typical timeline
- 8-16 weeks from permit to plaster
Installed, local pricing
$520 – $2,340 in fees
8-16 weeks from permit to plaster
Fort Lauderdale runs +27% against the U.S. average · data confidence High · modeled estimate, not a quote
The modeled midpoint for Fort Lauderdale is $78,700. The local adjustment for this trade is x1.269 — driven mainly by Broward County labor rates and 70% exposure to local code requirements.
Estimate your Fort Lauderdale job
Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.
Estimated total cost
$102,484 – $150,852
Turnkey, including permit allowance
- Pool surface area
- 450 sq ft
- Shell & excavation
- $59,960
- Decking
- $10,660
- Screen enclosure
- $29,314
- Approx. water volumeAt 5.5 ft average depth
- 18,513 gallons
Priced for Fort Lauderdale (local adjustment x1.269).
Estimates only. Local pricing, site conditions and code requirements change the real number.
Cost by project size
Generated from the same unit pricing the calculator uses.
| Project size | Estimated range |
|---|---|
| Small pool (under 300 sq ft) | $38,600 – $116,700 |
| Standard pool (300–450 sq ft) | $48,200 – $145,900 |
| Large pool (450–600 sq ft) | $62,700 – $189,700 |
| Large pool with spa and deck | $81,900 – $248,000 |
Based on Fort Lauderdale pricing of $48,200–$145,950 per in-ground gunite pool.
Cost by material
Installed cost in this market, with expected service life.
| Material | Installed range | Lifespan | Maintenance |
|---|---|---|---|
| Fiberglass Pool | $53,500 – $82,600 | 25–40 yrs | Low |
| Gunite / Concrete Pool | $74,800 – $133,800 | 50–75 yrs | High |
| Vinyl Liner Pool | $43,300 – $70,800 | 20–30 yrs | Moderate |
Where the money goes
- Labor
- $45,600
- 57% of median
- Materials
- $33,100
- 41% of median
- Permit & fees
- $1,430
- 2% of median
Fort Lauderdale project costs+27% vs U.S. average
Based on Broward County labor rates, local material logistics and permit-fee posture for this trade.
What the project looks like start to finish
Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.
01
Planning & quotes
Scope, material choice, contractor selection
02
Permit application
Filed with City of Fort Lauderdale Development Services
03
Materials & staging
Order lead time on non-stock materials
04
Installation
8-16 weeks from permit to plaster
05
Inspection
Steel / pre-gunite, Plumbing pressure test, Electrical bonding, Deck and barrier, Final pool and safety inspection
06
Closeout
Final sign-off, warranty and documentation
Fort Lauderdale labor intelligence
What the trade charges here, and how much of your price it is.
Loaded hourly rate
$64–$84
Outdoor crews in Broward County · +18% vs U.S. ($62/hr)
Typical crew
4 × 19.5 days
On-site time for a typical pool job here.
Labor in the price
$45,600
58% of the median — the rest is material, disposal and permit.
Because labor is 58% of this job, Fort Lauderdale wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.
Basis: Hometriva labor model: national outdoor crew rates adjusted by the Broward County labor factor (x1.182). · BLS Occupational Employment and Wage Statistics, Hometriva methodology
Why Fort Lauderdale differs from the national average
The local delta, broken into dollars by driver.
Trade labor rates+$6,550
Broward County crews price 18% above the national average, and labor is 58% of this job.
Code and inspection load+$6,300
Pool Installation carries 70% exposure to local code requirements, and this jurisdiction's review load indexes at x1.15.
Material and delivery+$2,875
Materials are nationally traded, so they move less — but delivery into this market runs 11% over baseline because of coastal logistics.
Permit fees+$325
Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.
Basis: Decomposition of the modeled Fort Lauderdale median against the U.S. median for this scope. · City of Fort Lauderdale Development Services, Hometriva methodology
Fort Lauderdale vs Florida vs the U.S.
Change the inputs, see your number
The same local model, run against your job instead of the average one.
Simulated pool installation in Fort Lauderdale
$80,130
Likely range $49,630 – $147,330
Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.
What makes the number move
- Pool size, depth and shape
- Gunite versus fiberglass versus vinyl liner
- Screen enclosure or cage
- Deck material and square footage
- Heater, saltwater system, spa and water features
- Required safety barrier and alarms
Who issues each permit
Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.
| Discipline | Issuing authority |
|---|---|
| building | City of Fort Lauderdale Development ServicesConfirmed department |
| electrical | City of Fort Lauderdale Development ServicesConfirmed department |
| mechanical | City of Fort Lauderdale Development ServicesConfirmed department |
| plumbing | City of Fort Lauderdale Development ServicesConfirmed department |
| zoning | City of Fort Lauderdale Development ServicesConfirmed department |
| fire | City of Fort Lauderdale Development ServicesConfirmed department |
Permit requirement in Fort Lauderdale
Yes — a permit is required for pool installation in Fort Lauderdale, FL. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.
- Permitting authority
- City of Fort Lauderdale Development ServicesConfirmed department
- Permit fee
- Based on declared project valuationSee the department's adopted fee schedule. Typical range for this scope: $520–$2,340.
Inspections
- Steel / pre-gunite
- Plumbing pressure test
- Electrical bonding
- Deck and barrier
- Final pool and safety inspection
Local conditions that change this job
Only the exposures that materially affect pool installation.
Cooling load / heat exposure
Severe90/100
Freeze-thaw cycles
Minimal4/100
Solar irradiance
Severe82/100
Broward County is also inside the HVHZ, so wind-borne debris protection is required for most exterior work.
Nearby market comparison
| Market | Local factor | Median | Per in-ground gunite pool |
|---|---|---|---|
| Fort Lauderdale (this page) | x1.269 | $78,700 | $48,200 – $145,950 |
| Miami | x1.326 | $82,200 | $50,400 – $152,500 |
| West Palm Beach | x1.226 | $76,000 | $46,600 – $141,000 |
| Port St. Lucie | x1.079 | $66,900 | $41,000 – $124,100 |
What Fort Lauderdale homeowners actually paid
Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.
Quotes homeowners were given in Fort Lauderdale
Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.
How Hometriva estimates Fort Lauderdale pool costs
Hometriva does not publish invented city prices. The Fort Lauderdale estimate for pool installation is produced by this chain, and every input is stored separately:
- National baseline$62,000
Typical U.S. cost for pool installation on a single-family home.
- Local labor factorx1.182
Fort Lauderdale-area trade labor rates, weighted at 58% of this job.
- Material factorx1.110
Material and delivery pricing into Broward County, weighted at 42%.
- Regulatory factorx1.145
Local code, product-approval and inspection load, applied at 70% for this project type.
- Applied multiplierx1.269
Blended Fort Lauderdale adjustment specific to pool installation.
- Permit component$520 – $2,340
Budgeted separately from the contract price because it is paid to the jurisdiction.
Because labor, material and regulatory factors are weighted per project, pool installation in Fort Lauderdale carries a different local adjustment than other trades in the same market.
Reviewed by
Hometriva Cost Data Desk
Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for pool installation pricing in Fort Lauderdale, FL.
- • National unit-cost baselines against current trade pricing
- • Local labor and materials factors for the market
- • Material installed-cost ranges and service life
Last reviewed August 2026 · Editorial standards · Report an error
Frequently asked questions
Do I need a permit to build a pool in Florida?
Yes. Every Florida jurisdiction requires a building permit with engineered plans for an in-ground pool, plus electrical and plumbing permits, and the pool cannot pass final inspection without a compliant safety barrier.
What safety barrier does Florida require?
The Residential Swimming Pool Safety Act requires at least one approved feature: a 4-foot barrier fence meeting code, an approved safety pool cover, self-closing and self-latching exit alarms on doors and windows with direct access, or an approved door alarm system.
How long does pool construction take?
Typical Florida in-ground pool construction runs 8-16 weeks from permit issuance, with inspection scheduling and weather as the two biggest sources of delay.
Sources
Sources & verification
- City of Fort Lauderdale Development Services
- Fort Lauderdale permit portal
- Florida Building Commission
- BLS Occupational Employment and Wage Statistics
Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.