Do you need a permit for kitchen remodel in Miami, FL?
Permit requirements, Miami-Dade County fees, required inspections and the exact documents Miami asks for.
Verified August 2026
Kitchen Remodel permit in Miami
It depends
It depends on scope. Like-for-like cosmetic work in Miami is often exempt, but a permit is required as soon as you change structure, plumbing, electrical or the building envelope.
Permit facts
| Jurisdiction | Miami, Miami-Dade County |
|---|---|
| Permit fee estimate | $270 – $1,285 |
| Who can pull it | Contractor or owner-builder |
| Owner-builder | Allowed on owner-occupied homes |
| Inspections | Rough plumbing and electrical, Framing where walls change, Final building inspection |
| Typical timeline | 6-12 weeks |
Documents to submit
- • Permit application
- • Floor plan showing changes
- • Electrical and plumbing scope
- • Contractor licensing
How to apply in Miami
- 1. Confirm scope with the Miami building department — exemptions vary by scope, not project type.
- 2. Prepare the documents above, including product approvals where wind-borne debris rules apply.
- 3. Submit through the Miami permit portal and pay the review fee.
- 4. Schedule each required inspection as the work reaches that stage.
- 5. Get the final inspection signed off — an open permit blocks the sale of the home.
What happens if you skip the permit
Unpermitted work commonly triggers double permit fees, a code enforcement lien, forced exposure of concealed work, insurance claim denial, and a failed disclosure at closing. Retroactive permits are possible but cost more and can require tearing out finished work.
Frequently asked questions
Do I need a permit for a kitchen remodel?
Cosmetic replacement — cabinets in the same location, countertops, appliances, paint and flooring — typically does not require a permit. You do need one as soon as you move plumbing or electrical, add circuits, or alter walls.
How long does a kitchen remodel take?
A cosmetic refresh runs 3-5 weeks. A full gut with layout changes and permits typically runs 8-12 weeks, with cabinet lead time as the most common bottleneck.