Interior
Kitchen Remodel: Cost, Permits & Timeline
Renovating a residential kitchen. Cosmetic work such as cabinet refacing and countertops is often permit-exempt, while moving plumbing, electrical or walls triggers a permit.
Verified August 2026
Typical cost
$38,500
$18,000 – $92,000
per kitchen
$18,000 – $92,000
Permit
Depends
$200 – $950
Timeline
6-12 weeks
6-12 weeks
Do you need a permit for kitchen remodel?
It depends on scope
Cosmetic, like-for-like kitchen remodel work is often exempt. A permit is required as soon as you change structure, plumbing, electrical or the building envelope.
What drives the cost
- Cabinet grade: stock, semi-custom or custom
- Countertop material and square footage
- Whether plumbing or electrical is relocated
- Appliance package
- Flooring and any wall removal
Permit, inspections and documents
| Permit status | conditional |
|---|---|
| Typical permit fee | $200 – $950 |
| Licensed contractor required | Not always |
| Owner-builder allowed | Yes, on owner-occupied homes |
| Inspections | Rough plumbing and electrical, Framing where walls change, Final building inspection |
| Timeline | 6-12 weeks |
| DIY difficulty | 4/5 difficulty |
Documents typically required
- • Permit application
- • Floor plan showing changes
- • Electrical and plumbing scope
- • Contractor licensing
Kitchen Remodel cost by city
Local labor and material pricing applied to the national baseline.
| City | Typical range | vs national |
|---|---|---|
| Miami | $21,200 – $108,600 | +18% |
| Tampa | $18,700 – $95,700 | +4% |
| Orlando | $18,400 – $93,800 | +2% |
| Fort Lauderdale | $20,500 – $104,900 | +14% |
| Jacksonville | $17,300 – $88,300 | -4% |
| West Palm Beach | $20,200 – $103,000 | +12% |
| St. Petersburg | $18,500 – $94,800 | +3% |
| Fort Myers | $19,600 – $100,300 | +9% |
| Cape Coral | $19,300 – $98,400 | +7% |
| Sarasota | $19,400 – $99,400 | +8% |
| Naples | $22,300 – $114,100 | +24% |
| Port St. Lucie | $18,400 – $93,800 | +2% |
Frequently asked questions
Do I need a permit for a kitchen remodel?
Cosmetic replacement — cabinets in the same location, countertops, appliances, paint and flooring — typically does not require a permit. You do need one as soon as you move plumbing or electrical, add circuits, or alter walls.
How long does a kitchen remodel take?
A cosmetic refresh runs 3-5 weeks. A full gut with layout changes and permits typically runs 8-12 weeks, with cabinet lead time as the most common bottleneck.
Sources
Sources & verification
Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.
