Interior

Bathroom Remodel: Cost, Permits & Timeline

Renovating a full or half bathroom. A shower pan replacement, relocated fixtures or new circuits generally require a permit and a pan water test inspection.

Model reviewed August 2026

Typical cost

$18,500

$9,000 – $42,000

per bathroom

$9,000 – $42,000

Permit

Depends

$150 – $600

Timeline

3-6 weeks

3-6 weeks

Do you need a permit for bathroom remodel?

It depends on scope

Cosmetic, like-for-like bathroom remodel work is often exempt. A permit is required as soon as you change structure, plumbing, electrical or the building envelope.

What drives the cost

  • Tub-to-shower conversion versus like-for-like replacement
  • Tile area and material
  • Vanity, fixtures and glass enclosure
  • Whether plumbing is relocated
  • Waterproofing and subfloor repair

Permit, inspections and documents

Permit statusconditional
Typical permit fee$150 – $600
Licensed contractor requiredNot always
Owner-builder allowedYes, on owner-occupied homes
InspectionsRough plumbing, Shower pan water test, Final inspection
Timeline3-6 weeks
DIY difficulty4/5 difficulty

Documents typically required

  • • Permit application
  • • Plumbing scope
  • • Waterproofing details for shower pans

Bathroom Remodel cost by city

Local labor and material pricing applied to the national baseline.

CityTypical rangevs national
New York$14,200 – $66,400+58%
Los Angeles$12,200 – $56,700+35%
Miami$11,000 – $51,300+22%
Chicago$11,000 – $51,200+22%
Phoenix$9,200 – $43,100+3%
Dallas$8,900 – $41,700-1%
Houston$9,000 – $41,9000%
Tampa$9,600 – $44,600+6%
Denver$10,200 – $47,400+13%
Orlando$9,300 – $43,200+3%
Atlanta$9,000 – $42,1000%
Fort Lauderdale$10,600 – $49,500+18%

Bathroom Remodel across the country

National pricing, state-by-state pricing, and the tools behind both.

Frequently asked questions

Do I need a permit for a bathroom remodel?

Replacing a vanity, toilet or fixtures in the same location is usually permit-exempt. Rebuilding a shower pan, moving drain lines or adding circuits requires a plumbing or building permit and inspection.

How long does bathroom remodel take?

3-6 weeks. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are tub-to-shower conversion versus like-for-like replacement; tile area and material; vanity, fixtures and glass enclosure.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.