Kitchen Cabinet Refacing: Cost, Permits & Timeline

Replacing cabinet doors, drawer fronts and veneer while keeping the existing boxes. Costs roughly 40 to 60 percent of a full cabinet replacement with no plumbing or electrical work.

Verified August 2026

Typical cost

$9,500

$4,500 – $20,000

per linear foot of cabinetry

$220 – $650

Permit

Rarely

$0 – $150

Timeline

3-5 days of work

3-5 days of work

Do you need a permit for kitchen cabinet refacing?

Usually no

Kitchen Cabinet Refacing is permitted and inspected work in nearly every jurisdiction. Typical fees run $0 to $150, and homeowners can usually pull an owner-builder permit on a home they own and occupy.

What drives the cost

  • Linear feet of cabinetry and door count
  • Veneer, thermofoil or solid wood fronts
  • New soft-close hardware
  • Adding crown molding or end panels
  • Condition of the existing boxes

Permit, inspections and documents

Permit statusrarely required
Typical permit fee$0 – $150
Licensed contractor requiredNot always
Owner-builder allowedYes, on owner-occupied homes
Inspections
Timeline3-5 days of work
DIY difficulty4/5 difficulty

Documents typically required

    Kitchen Cabinet Refacing cost by city

    Local labor and material pricing applied to the national baseline.

    CityTypical rangevs national
    Miami$5,300$23,600+18%
    Tampa$4,700$20,800+4%
    Orlando$4,600$20,400+2%
    Fort Lauderdale$5,100$22,800+14%
    Jacksonville$4,300$19,200-4%
    West Palm Beach$5,000$22,400+12%
    St. Petersburg$4,600$20,600+3%
    Fort Myers$4,900$21,800+9%
    Cape Coral$4,800$21,400+7%
    Sarasota$4,900$21,600+8%
    Naples$5,600$24,800+24%
    Port St. Lucie$4,600$20,400+2%

    Frequently asked questions

    Is cabinet refacing worth it?

    Refacing makes sense when the existing boxes are solid and the layout works. If the boxes are particleboard that has swollen from moisture, or you want to change the layout, full replacement is the better value.