Tree Removal cost in Florida
Statewide pricing, permit posture and inspection sequence for tree removal in Florida. Your city or county issues the actual permit — use the local links below to confirm fees.
Model reviewed August 2026
Tree Removal cost in Florida
$500 – $5,900
Most Florida homeowners pay around $1,500, or $500–$5,850 per tree. Permit fees typically add $0–$345.
Permit: It depends. Florida Building Code, 8th Edition (2023)
Cost breakdown
| Budget scope | $500 |
|---|---|
| Typical project | $1,500 |
| Premium / complex | $5,900 |
| per tree | $500 – $5,850 |
| Permit fees | $0 – $345 |
| vs national baseline | +7% |
| Timeline | Same day to 2 days, 1-4 weeks if a permit is required |
What is different about tree removal in Florida
One statewide code is enforced by 67 counties and 411 municipalities, and wind-borne debris, product approval and flood 50% rules change the scope of nearly every exterior project.
Owner-builder: Owner-builder exemption available on an owner-occupied home under FS 489.103(7). Tree Removal is one of the scopes a homeowner can more realistically permit themselves.
What drives the price
- Tree height, species and trunk diameter
- Proximity to the house and power lines
- Crane or bucket truck access
- Stump grinding and debris haul-off
- Emergency post-storm service
Tree Removal pricing by city
Permit difficulty by city
Hometriva Permit Complexity Index: review load, added discipline reviews, wind and flood overlays, and how each jurisdiction sets fees.
| City | Complexity | Review time | Inspections |
|---|---|---|---|
| Miami | 56/100 · Complex | 5–18 days | 1 |
| Fort Lauderdale | 56/100 · Complex | 5–18 days | 1 |
| West Palm Beach | 56/100 · Complex | 5–18 days | 1 |
| Tampa | 51/100 · Moderate | 4–16 days | 1 |
| St. Petersburg | 56/100 · Complex | 5–18 days | 1 |
| Clearwater | 56/100 · Complex | 5–18 days | 1 |
| Orlando | 37/100 · Moderate | 3–12 days | 0 |
| Kissimmee | 34/100 · Simple | 3–11 days | 0 |
| Jacksonville | 41/100 · Moderate | 3–13 days | 1 |
| St. Augustine | 43/100 · Moderate | 4–13 days | 1 |
| Sarasota | 51/100 · Moderate | 4–16 days | 1 |
| Bradenton | 48/100 · Moderate | 4–15 days | 1 |
What Florida homeowners reported paying
Invoice amounts submitted for this state, shown beside the model.
Rebates and incentives in Florida
What is still claimable, what expired, and where to check your own utility territory.
Federally funded, state-administered rebates for heat pumps, panel and wiring upgrades, insulation and whole-home retrofits. Availability, income tiers and funding depend entirely on the state program and can pause when a state's allocation runs out.
U.S. DOE — Home Energy Rebates- DSIRE — every Florida incentive by ZIPThe N.C. Clean Energy Technology Center database. The authoritative list of state, utility and local programs.
- ENERGY STAR rebate finderUtility and manufacturer rebates by ZIP code for HVAC, water heating and appliances.
- DOE Home Energy Rebates — Florida statusShows whether the state's HEAR/HOMES program is open, waitlisted or not yet launched.
Frequently asked questions
Do I need a permit to remove a tree in Florida?
Florida Statute 163.045 lets a residential property owner remove a tree without a local permit when a certified arborist or licensed landscape architect documents that it poses an unacceptable risk. Otherwise, most cities require a permit for protected species above a size threshold.
How long does tree removal take?
Same day to 2 days, 1-4 weeks if a permit is required. Permit review and inspection scheduling are usually the largest source of variation.
What changes the price the most?
The largest cost drivers are tree height, species and trunk diameter; proximity to the house and power lines; crane or bucket truck access.
Sources
Sources & verification
Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.