Driveway Replacement: Cost, Permits & Timeline

Tearing out and replacing a residential driveway in concrete, pavers or asphalt.

Model reviewed August 2026

Typical cost

$8,600

$4,200 – $19,000

per sq ft of driveway

$6 – $22

Permit

Usually

$80 – $350

Timeline

2-4 days of work plus 7 days of concrete cure

2-4 days of work plus 7 days of concrete cure, 2-5 weeks total

Do you need a permit for driveway replacement?

Usually yes

Driveway Replacement is permitted and inspected work in most jurisdictions. Typical fees run $80 to $350. Homeowners can usually pull an owner-builder permit on a home they own and occupy.

What drives the cost

  • Square footage and thickness
  • Concrete versus pavers versus asphalt
  • Demolition and haul-off of the old surface
  • Base preparation and drainage
  • Apron work in the public right-of-way

Permit, inspections and documents

Permit statususually required
Typical permit fee$80 – $350
Licensed contractor requiredNot always
Owner-builder allowedYes, on owner-occupied homes
InspectionsForm / subgrade inspection, Final inspection
Timeline2-4 days of work plus 7 days of concrete cure, 2-5 weeks total
DIY difficulty4/5 difficulty

Documents typically required

  • • Permit application
  • • Site plan with dimensions and impervious area
  • • Right-of-way permit for apron work

Driveway Replacement cost by city

Local labor and material pricing applied to the national baseline.

CityTypical rangevs national
New York$7,100 – $31,900+68%
Los Angeles$5,900 – $26,800+41%
Miami$5,300 – $24,100+27%
Chicago$5,300 – $24,000+26%
Phoenix$4,300 – $19,700+3%
Dallas$4,200 – $19,1000%
Houston$4,200 – $19,1000%
Tampa$4,500 – $20,400+8%
Denver$4,800 – $21,900+15%
Orlando$4,400 – $19,700+4%
Atlanta$4,200 – $19,200+1%
Fort Lauderdale$5,100 – $23,200+22%

Driveway Replacement across the country

National pricing, state-by-state pricing, and the tools behind both.

Frequently asked questions

How long does driveway replacement take?

2-4 days of work plus 7 days of concrete cure, 2-5 weeks total. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are square footage and thickness; concrete versus pavers versus asphalt; demolition and haul-off of the old surface.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.