Ductwork Replacement: Cost, Permits & Timeline

Replacing leaking or mold-contaminated attic ductwork. Florida requires a duct leakage test on replacement duct systems, which is why this is a permitted, inspected job.

Verified August 2026

Typical cost

$5,400

$2,500 – $12,000

per supply run

$250 – $600

Permit

Required

$90 – $320

Timeline

1-3 days of work

1-3 days of work, 1-3 weeks including permitting

Do you need a permit for ductwork replacement?

Yes

Ductwork Replacement is permitted and inspected work in nearly every jurisdiction. Typical fees run $90 to $320, and a licensed contractor generally has to pull the permit.

What drives the cost

  • Number of supply and return runs
  • Flex duct versus rigid sheet metal
  • Attic access and clearance
  • Return air sizing corrections
  • Removal of contaminated duct board

Permit, inspections and documents

Permit statusrequired
Typical permit fee$90 – $320
Licensed contractor requiredUsually yes
Owner-builder allowedRarely
InspectionsDuct rough-in, Duct leakage test, Final mechanical inspection
Timeline1-3 days of work, 1-3 weeks including permitting
DIY difficulty5/5 difficulty

Documents typically required

  • Mechanical permit application
  • HVAC contractor license
  • Duct leakage test report

Ductwork Replacement cost by city

Local labor and material pricing applied to the national baseline.

CityTypical rangevs national
Miami$3,000$14,200+18%
Tampa$2,600$12,500+4%
Orlando$2,600$12,200+2%
Fort Lauderdale$2,800$13,700+14%
Jacksonville$2,400$11,500-4%
West Palm Beach$2,800$13,400+12%
St. Petersburg$2,600$12,400+3%
Fort Myers$2,700$13,100+9%
Cape Coral$2,700$12,800+7%
Sarasota$2,700$13,000+8%
Naples$3,100$14,900+24%
Port St. Lucie$2,600$12,200+2%

Frequently asked questions

Does duct replacement need a permit in Florida?

Yes. Replacing a duct system requires a mechanical permit and a duct leakage test in most Florida jurisdictions, because duct leakage is regulated under the energy code.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.