Exterior

Exterior Painting: Cost, Permits & Timeline

Pressure washing, patching and repainting stucco, siding and trim. Florida UV and afternoon rain make elastomeric and acrylic coatings the standard choice on stucco.

Verified August 2026

Typical cost

$6,400

$2,800 – $15,000

per sq ft of wall area

$2.2 – $6

Permit

Rarely

$0 – $0

Timeline

4-8 days of work

4-8 days of work

Do you need a permit for exterior painting?

Usually no

Exterior Painting is permitted and inspected work in nearly every jurisdiction. Typical fees run $0 to $0, and homeowners can usually pull an owner-builder permit on a home they own and occupy.

What drives the cost

  • Wall square footage and number of stories
  • Stucco crack patching before painting
  • Elastomeric versus standard acrylic coating
  • Trim, soffit and shutter detail
  • Pressure washing and mildew treatment

Permit, inspections and documents

Permit statusrarely required
Typical permit fee$0 – $0
Licensed contractor requiredNot always
Owner-builder allowedYes, on owner-occupied homes
Inspections
Timeline4-8 days of work
DIY difficulty3/5 difficulty

Documents typically required

  • HOA color approval where applicable

Exterior Painting cost by city

Local labor and material pricing applied to the national baseline.

CityTypical rangevs national
Miami$3,300$17,700+18%
Tampa$2,900$15,600+4%
Orlando$2,900$15,300+2%
Fort Lauderdale$3,200$17,100+14%
Jacksonville$2,700$14,400-4%
West Palm Beach$3,100$16,800+12%
St. Petersburg$2,900$15,500+3%
Fort Myers$3,100$16,400+9%
Cape Coral$3,000$16,100+7%
Sarasota$3,000$16,200+8%
Naples$3,500$18,600+24%
Port St. Lucie$2,900$15,300+2%

Frequently asked questions

How often should a Florida house be repainted?

Expect 5 to 7 years for standard acrylic on stucco in coastal Florida and 8 to 12 years for a properly applied elastomeric coating. South-facing walls fail first.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.