Energy

Solar Panel Installation: Cost, Permits & Timeline

Installing a grid-tied rooftop solar array with inverters and, optionally, battery storage.

Model reviewed August 2026

Typical cost

$26,500

$15,000 – $48,000

per watt installed

$2.4 – $3.8

Permit

Required

$150 – $500

Timeline

1-3 days of installation

1-3 days of installation, 6-14 weeks including permitting and utility interconnection

Do you need a permit for solar panel installation?

Yes

Solar Panel Installation is permitted and inspected work in essentially every jurisdiction. Typical fees run $150 to $500. A licensed contractor generally has to pull the permit.

What drives the cost

  • System size in kW DC
  • Panel and inverter selection (string versus microinverters)
  • Battery storage
  • Roof age, material and structural reinforcement
  • Federal tax credit and utility interconnection fees

Permit, inspections and documents

Permit statusrequired
Typical permit fee$150 – $500
Licensed contractor requiredUsually yes
Owner-builder allowedRarely
InspectionsStructural / mounting inspection, Electrical rough, Final inspection, Utility interconnection
Timeline1-3 days of installation, 6-14 weeks including permitting and utility interconnection
DIY difficulty5/5 difficulty

Documents typically required

  • • Building and electrical permit applications
  • • Engineered structural attachment plans
  • • Single-line electrical diagram
  • • Utility interconnection agreement
  • • Equipment specification sheets

Solar Panel Installation cost by city

Local labor and material pricing applied to the national baseline.

CityTypical rangevs national
New York$24,300 – $77,800+62%
Los Angeles$20,700 – $66,400+38%
Miami$19,100 – $61,200+28%
Chicago$18,800 – $60,100+25%
Phoenix$15,600 – $49,900+4%
Dallas$15,300 – $48,900+2%
Houston$15,500 – $49,400+3%
Tampa$16,300 – $52,200+9%
Denver$17,100 – $54,800+14%
Orlando$15,600 – $49,900+4%
Atlanta$15,400 – $49,200+2%
Fort Lauderdale$18,500 – $59,000+23%

Solar Panel Installation across the country

National pricing, state-by-state pricing, and the tools behind both.

Frequently asked questions

Should I replace my roof before installing solar?

If your roof has fewer than about 10 years of life left, replace it first. Removing and reinstalling an array later commonly costs $3,000-$7,000.

Do I need a permit for solar panel installation?

In most jurisdictions this work is permitted and inspected. Requirements are set locally, so confirm the current application and inspection checklist with your building department before work starts.

How long does solar panel installation take?

1-3 days of installation, 6-14 weeks including permitting and utility interconnection. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are system size in kw dc; panel and inverter selection (string versus microinverters); battery storage.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.