Denver, CO · Denver County

Well Installation in Denver, CO: Cost & Permits

What well installation actually costs in Denver, whether you need a permit, which inspections apply, and how long the job takes.

Verified August 2026

Typical local cost

$13,000

$6,500 – $29,500

per foot of depth

$29.50 – $77

Permit fee

$230 – $920

Modeled allowance

vs national

+18%

local labor & materials

Looking for pricing detail? The full well installation cost breakdown for Denver covers cost by size and material, the local cost model and nearby markets.

Do you need a permit for well installation in Denver, CO?

Yes

Yes — a permit is required for well installation in Denver, CO. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Front Range hail is the single largest driver of roof replacement volume, and Denver runs its own combined city-county permitting authority.

Cost breakdown in Denver

Low endSimple scope, competitive bid$6,500
TypicalMost homeowners land here$13,000
High endComplex access, premium materials$29,500
per foot of depth$29.50 – $77
Permit feeEstimated allowance $230$920Modeled from comparable fee schedules — not an official quoted fee.
Permit authorityCity of Denver building departmentModeled estimate
Timeline2-5 days of drilling, 3-8 weeks including permitting

Math: national baseline $5,500$25,000 × Denver cost index 1.12. Permit fees use a 1.15 local multiplier. Estimates, not quotes.

What drives your price here

  • Depth to a reliable aquifer in your area
  • Casing diameter and material
  • Submersible pump horsepower and pressure tank
  • Water treatment for sulfur or iron
  • Electrical service to the wellhead

Permit process and inspections

Permit requiredYes
Who pulls itLicensed contractor
InspectionsWell completion inspection, Water quality test, Final plumbing inspection
DocumentsWater well construction permit from the water management district, Licensed water well contractor number, Well completion report, Bacteriological water sample results
ApplyDenver permit portal

Frequently asked questions

Who issues well permits in Florida?

Florida's five water management districts issue water well construction permits, often delegated to a county health department. The local building department only handles the electrical and plumbing connection.

Well costs in nearby cities

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.

Page data quality: 89/100
  • Verified permit status
  • Official source linked
  • Local cost range
  • Inspection detail
  • Unique local rule
  • Local fee estimate
  • Useful FAQ
  • Relevant calculator
  • Internal links