Electrical Panel Replacement in Palm Beach County, Florida

Permit requirements, inspections and modeled costs for electrical panel replacement in unincorporated Palm Beach County. If your address falls inside a city, the municipal building department issues the permit instead.

Verified August 2026

Do you need a permit for electrical panel replacement in Palm Beach County?

Yes

Yes — a permit is required for electrical panel replacement in Unincorporated Palm Beach County, FL. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Budget $2,200$7,800 for the work itself (typically $3,900) plus $130$485 in permit fees.

Palm Beach County cost model

Budget scope$2,200
Typical project$3,900
Premium / complex$7,800
per panel upgrade$2,200 – $7,800
Permit fees$130 – $485
vs national baseline+15%
Timeline1 day of work, 1-4 weeks including utility coordination

Inspections you should expect

  • Utility disconnect coordination
  • Rough electrical
  • Final electrical inspection

What the county will ask for

  • Electrical permit application
  • Licensed electrician information
  • Load calculation
  • Panel schedule

Cities inside the county that permit their own work

If the property is inside these municipalities, apply to the city rather than the county.

Statewide rules that apply here

Palm Beach County enforces the 8th Edition (2023) Florida Building Code, effective December 31, 2023. Local amendments can add requirements but cannot reduce the statewide minimum.

Frequently asked questions

Do I need a permit to replace an electrical panel?

Yes, always. An electrical permit is required, a licensed electrical contractor must perform the work in most Florida jurisdictions, and the utility will not reconnect service until the final inspection passes.

How long does a panel upgrade take?

The physical work is usually one day with power off for 4-8 hours. Utility disconnect scheduling and inspection generally stretch the total to one to four weeks.