Mount Pleasant, SC · Charleston County

Pool Enclosure / Screen Cage in Mount Pleasant, SC: Cost & Permits

What pool enclosure / screen cage actually costs in Mount Pleasant, whether you need a permit, which inspections apply, and how long the job takes.

Model reviewed August 2026

Typical local cost

$16,900

$8,400 – $39,400

per sq ft of enclosure

$17 – $37.50

Permit fee

$160 – $630

Modeled allowance

vs national

-6%

local labor & materials

Looking for pricing detail? The full pool enclosure / screen cage cost breakdown for Mount Pleasant covers cost by size and material, the local cost model and nearby markets.

Do you need a permit for pool enclosure / screen cage in Mount Pleasant, SC?

Yes

Yes — a permit is required for pool enclosure / screen cage in Mount Pleasant, SC. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Cost breakdown in Mount Pleasant

Low endSimple scope, competitive bid$8,400
TypicalMost homeowners land here$16,900
High endComplex access, premium materials$39,400
per sq ft of enclosure$17 – $37.50
Permit feeEstimated allowance $160$630Modeled from comparable fee schedules — not an official quoted fee.
Permit authorityCity of Mount Pleasant building departmentModeled estimate
Timeline1-2 weeks of work, 4-10 weeks including engineering and permitting

Math: national median $18,000 × 0.939 = $16,900 in Mount Pleasant-6% versus the national model. The multiplier blends local labor and material costs with this project's labor share, so it is not the same as the city's overall cost index (0.92). Permit fees use a 0.90 local multiplier. Estimates, not quotes.

What drives your price here

  • Enclosure footprint and height
  • Mansard versus gable roof style
  • Screen type including no-see-um and pet screen
  • Design wind speed for the parcel
  • Existing deck footing capacity

Permit process and inspections

Permit requiredYes
Who pulls itLicensed contractor
InspectionsFooting / anchor inspection, Framing inspection, Final inspection
DocumentsPermit application, Engineered structural plans, Survey with setbacks, Wind-load calculations
ApplyMount Pleasant building department (no verified online portal on file)

Frequently asked questions

Do I need a permit for pool enclosure / screen cage in Mount Pleasant, South Carolina?

In most jurisdictions this work is permitted and inspected. Requirements are set locally, so confirm the current application and inspection checklist with your building department before work starts.

How long does pool enclosure / screen cage take?

1-2 weeks of work, 4-10 weeks including engineering and permitting. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are enclosure footprint and height; mansard versus gable roof style; screen type including no-see-um and pet screen.

Pool Cage costs in nearby cities

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.