Countertop Replacement cost in Virginia Beach, VA

Virginia Beach, VA · updated August 2026

$4,800

Typical local cost

$2,200 – $12,000

Typical range

per sq ft installed
$50 – $150

Installed, local pricing

Permit
Usually no

$0 – $150 in fees

Typical timeline
1 day of installation

1 day of installation, 2-3 weeks after templating

Calculate my countertops cost

Virginia Beach runs 0% against the U.S. average · data confidence Medium · modeled estimate, not a quote

Most Virginia Beach homeowners pay around $4,800. The local adjustment for this trade is x1.003 — driven mainly by Virginia Beach City labor rates and 5% exposure to local code requirements.

Estimate your Virginia Beach job

Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.

Square footage

180 sq ft

With waste allowance
198 sq ft
Square yards
20
Perimeter (per area)
54 ft
Square meters
16.72

Estimates only. Local pricing, site conditions and code requirements change the real number.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
30 sq ft installed$1,500$4,500
40 sq ft installed$2,000$6,000
50 sq ft installed$2,500$7,500
60 sq ft installed$3,000$9,000
80 sq ft installed$4,000$12,000

Based on Virginia Beach pricing of $50–$150 per sq ft installed.

Where the money goes

Labor
$1,700
35% of median
Materials
$3,100
64% of median
Permit & fees
$75
2% of median

Virginia Beach project costs+0% vs U.S. average

Based on Virginia Beach City labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Scheduling

    No permit typically required for this scope

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    1 day of installation, 2-3 weeks after templating

  5. 05

    Closeout

    Final sign-off, warranty and documentation

Virginia Beach labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$50–$64

Interior crews in Virginia Beach City · -3% vs U.S. ($58/hr)

Typical crew

2 × 2 days

On-site time for a typical countertops job here.

Labor in the price

$1,700

35% of the median — the rest is material, disposal and permit.

Because labor is 35% of this job, Virginia Beach wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national interior crew rates adjusted by the Virginia Beach City labor factor (x0.974). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Virginia Beach differs from the national average

The local delta, broken into dollars by driver.

Material and delivery$50Trade labor rates$50
Dollars of the Virginia Beach difference owned by each driver, versus the U.S. median for countertop replacement.
  • Material and delivery+$50

    Materials are nationally traded, so they move less — but delivery into this market runs 2% over baseline because of coastal logistics.

  • Trade labor rates-$50

    Virginia Beach City crews price 3% below the national average, and labor is 35% of this job.

Basis: Decomposition of the modeled Virginia Beach median against the U.S. median for this scope. · City of Virginia Beach building department, Hometriva methodology

Virginia Beach vs Virginia vs the U.S.

Virginia Beach$2,200$12,000Virginia average$2,300$12,400U.S. average$2,200$12,000
Modeled ranges for countertop replacement. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated countertop replacement in Virginia Beach

$4,875

Likely range $2,275$12,075

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Square footage and number of slabs
  • Material: laminate, quartz, granite or porcelain
  • Edge profile and cutouts
  • Backsplash included
  • Sink and faucet reconnection

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Virginia Beach building departmentModeled estimate
electricalCity of Virginia Beach building departmentModeled estimate
mechanicalCity of Virginia Beach building departmentModeled estimate
plumbingCity of Virginia Beach building departmentModeled estimate
zoningCity of Virginia Beach building departmentModeled estimate
fireCity of Virginia Beach building departmentModeled estimate

Permit requirement in Virginia Beach

Usually no permit is required in Virginia Beach, but zoning rules such as setbacks and HOA approval can still apply.

Permitting authority
City of Virginia Beach building departmentModeled estimate
Permit fee
Estimated allowance $0$150Modeled from comparable fee schedules — not an official quoted fee.
Full Virginia Beach permit guide for countertop replacement

Local conditions that change this job

Only the exposures that materially affect countertop replacement.

Humidity

Severe80/100

Coastal wind exposure, salt air and repetitive-loss flood zones change roofing, siding and elevation requirements near the water.

Nearby market comparison

MarketLocal factorMedianPer sq ft installed
Virginia Beach (this page)x1.003$4,800$50$150
Richmondx0.995$4,800$50$150
Raleighx0.987$4,700$50$150
Baltimorex1.079$5,200$50$150

What Virginia Beach homeowners actually paid

Real reported invoices from this market, aggregated. Add yours — it takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Virginia Beach

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Virginia Beach countertops costs

Hometriva does not publish invented city prices. The Virginia Beach estimate for countertop replacement is produced by this chain, and every input is stored separately:

  1. National baseline$4,800

    Typical U.S. cost for countertop replacement on a single-family home.

  2. Local labor factorx0.974

    Virginia Beach-area trade labor rates, weighted at 35% of this job.

  3. Material factorx1.016

    Material and delivery pricing into Virginia Beach City, weighted at 65%.

  4. Regulatory factorx1.042

    Local code, product-approval and inspection load, applied at 5% for this project type.

  5. Applied multiplierx1.003

    Blended Virginia Beach adjustment specific to countertop replacement.

  6. Permit component$0 – $150

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, countertop replacement in Virginia Beach carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for countertop replacement pricing in Virginia Beach, VA.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

Quartz or granite in a Florida kitchen?

Quartz is non-porous and needs no sealing, which suits humid Florida kitchens. Granite handles heat better and each slab is unique, but it needs resealing every one to three years.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.

Related pages