Countertop Replacement: Cost, Permits & Timeline

Replacing kitchen or bath countertops with quartz, granite, or solid surface. Templating and fabrication add two to three weeks between measurement and installation.

Verified August 2026

Typical cost

$4,800

$2,200 – $12,000

per sq ft installed

$40 – $160

Permit

Rarely

$0 – $150

Timeline

1 day of installation

1 day of installation, 2-3 weeks after templating

Do you need a permit for countertop replacement?

Usually no

Countertop Replacement is permitted and inspected work in nearly every jurisdiction. Typical fees run $0 to $150, and homeowners can usually pull an owner-builder permit on a home they own and occupy.

What drives the cost

  • Square footage and number of slabs
  • Material: laminate, quartz, granite or porcelain
  • Edge profile and cutouts
  • Backsplash included
  • Sink and faucet reconnection

Permit, inspections and documents

Permit statusrarely required
Typical permit fee$0 – $150
Licensed contractor requiredNot always
Owner-builder allowedYes, on owner-occupied homes
Inspections
Timeline1 day of installation, 2-3 weeks after templating
DIY difficulty4/5 difficulty

Documents typically required

  • Plumbing permit if the sink location moves

Countertop Replacement cost by city

Local labor and material pricing applied to the national baseline.

CityTypical rangevs national
Miami$2,600$14,200+18%
Tampa$2,300$12,500+4%
Orlando$2,200$12,200+2%
Fort Lauderdale$2,500$13,700+14%
Jacksonville$2,100$11,500-4%
West Palm Beach$2,500$13,400+12%
St. Petersburg$2,300$12,400+3%
Fort Myers$2,400$13,100+9%
Cape Coral$2,400$12,800+7%
Sarasota$2,400$13,000+8%
Naples$2,700$14,900+24%
Port St. Lucie$2,200$12,200+2%

Frequently asked questions

Quartz or granite in a Florida kitchen?

Quartz is non-porous and needs no sealing, which suits humid Florida kitchens. Granite handles heat better and each slab is unique, but it needs resealing every one to three years.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.