Driveway Replacement cost in Summerville, SC

Summerville, SC · updated August 2026

$7,700

Typical local cost

$3,800 – $17,000

Typical range

per sq ft of driveway
$5.50 – $19.50

Installed, local pricing

Permit
Usually yes

$70 – $300 in fees

Typical timeline
2-4 days of work plus 7 days of concrete cure

2-4 days of work plus 7 days of concrete cure, 2-5 weeks total

Calculate my driveway cost

Summerville runs -10% against the U.S. average · data confidence High · modeled estimate, not a quote

The modeled midpoint for Summerville is $7,700. The local adjustment for this trade is x0.897 — driven mainly by Dorchester County labor rates and 40% exposure to local code requirements.

Estimate your Summerville job

Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.

Estimated total cost

$6,243 – $9,185

Cost per square foot
$11 – $15
Demolition
$1,615
Concrete volume (5 in)
9.3 cubic yards

Priced for Summerville (local adjustment x0.897).

Estimates only. Local pricing, site conditions and code requirements change the real number.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
400 sq ft of driveway$2,200$7,800
500 sq ft of driveway$2,800$9,800
600 sq ft of driveway$3,300$11,700
800 sq ft of driveway$4,400$15,600
1,000 sq ft of driveway$5,500$19,500

Based on Summerville pricing of $6–$20 per sq ft of driveway.

Cost by material

Installed cost in this market, with expected service life.

MaterialInstalled rangeLifespanMaintenance
Poured Concrete Driveway$6,200 $10,0002540 yrsLow
Paver Driveway$9,600 $16,2003050 yrsModerate
Asphalt Driveway$4,200 $6,9001525 yrsHigh

Where the money goes

Labor
$4,500
57% of median
Materials
$3,200
41% of median
Permit & fees
$185
2% of median

Summerville project costs-10% vs U.S. average

Based on Dorchester County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Summerville building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    2-4 days of work plus 7 days of concrete cure, 2-5 weeks total

  5. 05

    Inspection

    Form / subgrade inspection, Final inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Summerville labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$47–$61

Outdoor crews in Dorchester County · -14% vs U.S. ($62/hr)

Typical crew

3 × 3.5 days

On-site time for a typical driveway job here.

Labor in the price

$4,500

58% of the median — the rest is material, disposal and permit.

Because labor is 58% of this job, Summerville wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national outdoor crew rates adjusted by the Dorchester County labor factor (x0.857). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Summerville differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$725Material and delivery$175Permit fees$25
Dollars of the Summerville difference owned by each driver, versus the U.S. median for driveway replacement.
  • Trade labor rates-$725

    Dorchester County crews price 14% below the national average, and labor is 58% of this job.

  • Material and delivery-$175

    Materials are nationally traded, so they move less — but delivery into this market runs 5% under baseline.

  • Permit fees-$25

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

Basis: Decomposition of the modeled Summerville median against the U.S. median for this scope. · City of Summerville building department, Hometriva methodology

Summerville vs South Carolina vs the U.S.

Summerville$3,800$17,000South Carolina average$3,900$17,700U.S. average$4,200$19,000
Modeled ranges for driveway replacement. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated driveway replacement in Summerville

$7,885

Likely range $3,985$17,185

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Square footage and thickness
  • Concrete versus pavers versus asphalt
  • Demolition and haul-off of the old surface
  • Base preparation and drainage
  • Apron work in the public right-of-way

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Summerville building departmentModeled estimate
electricalCity of Summerville building departmentModeled estimate
mechanicalCity of Summerville building departmentModeled estimate
plumbingCity of Summerville building departmentModeled estimate
zoningCity of Summerville building departmentModeled estimate
fireCity of Summerville building departmentModeled estimate

Permit requirement in Summerville

In most cases yes — Dorchester County and the City of Summerville generally require a permit for driveway replacement. Height, size and location on the lot determine the exact review, so confirm with the building department before you start.

Permitting authority
City of Summerville building departmentModeled estimate
Permit fee
Estimated allowance $70$300Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Form / subgrade inspection
  2. Final inspection
Full Summerville permit guide for driveway replacement

Local conditions that change this job

Only the exposures that materially affect driveway replacement.

Cooling load / heat exposure

Severe82/100

Freeze-thaw cycles

Minimal4/100

Annual rainfall

High74/100

Nearby market comparison

MarketLocal factorMedianPer sq ft of driveway
Summerville (this page)x0.897$7,700$5.50$19.50
North Charlestonx0.932$8,000$5.50$20.50
Charlestonx1.034$8,900$6$22.50
Mount Pleasantx0.932$8,000$5.50$20.50

What Summerville homeowners actually paid

Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Summerville

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Summerville driveway costs

Hometriva does not publish invented city prices. The Summerville estimate for driveway replacement is produced by this chain, and every input is stored separately:

  1. National baseline$8,600

    Typical U.S. cost for driveway replacement on a single-family home.

  2. Local labor factorx0.857

    Summerville-area trade labor rates, weighted at 58% of this job.

  3. Material factorx0.954

    Material and delivery pricing into Dorchester County, weighted at 42%.

  4. Regulatory factorx0.998

    Local code, product-approval and inspection load, applied at 40% for this project type.

  5. Applied multiplierx0.897

    Blended Summerville adjustment specific to driveway replacement.

  6. Permit component$70 – $300

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, driveway replacement in Summerville carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for driveway replacement pricing in Summerville, SC.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

How long does driveway replacement take?

2-4 days of work plus 7 days of concrete cure, 2-5 weeks total. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are square footage and thickness; concrete versus pavers versus asphalt; demolition and haul-off of the old surface.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.