Pool Enclosure / Screen Cage cost in West Palm Beach, FL

West Palm Beach, FL · updated August 2026

$22,300

Typical local cost

$11,200 – $52,100

Typical range

per sq ft of enclosure
$22.50 – $49.50

Installed, local pricing

Permit
Yes

$220 – $855 in fees

Typical timeline
1-2 weeks of work

1-2 weeks of work, 4-10 weeks including engineering and permitting

Calculate my pool cage cost

West Palm Beach runs +24% against the U.S. average · data confidence High · modeled estimate, not a quote

The modeled midpoint for West Palm Beach is $22,300. The local adjustment for this trade is x1.240 — driven mainly by Palm Beach County labor rates and 80% exposure to local code requirements.

Estimate your West Palm Beach job

Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.

Square footage

180 sq ft

With waste allowance
198 sq ft
Square yards
20
Perimeter (per area)
54 ft
Square meters
16.72

Priced for West Palm Beach (local adjustment x1.240).

Estimates only. Local pricing, site conditions and code requirements change the real number.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
400 sq ft of enclosure$9,000$19,800
500 sq ft of enclosure$11,300$24,800
600 sq ft of enclosure$13,500$29,700
800 sq ft of enclosure$18,000$39,600
1,100 sq ft of enclosure$24,800$54,500

Based on West Palm Beach pricing of $23–$50 per sq ft of enclosure.

Cost by material

Installed cost in this market, with expected service life.

MaterialInstalled rangeLifespanMaintenance
Aluminum Fence$22,300 $35,7003050 yrsVery low

Where the money goes

Labor
$12,900
56% of median
Materials
$9,400
41% of median
Permit & fees
$540
2% of median

West Palm Beach project costs+24% vs U.S. average

Based on Palm Beach County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of West Palm Beach building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    1-2 weeks of work, 4-10 weeks including engineering and permitting

  5. 05

    Inspection

    Footing / anchor inspection, Framing inspection, Final inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

West Palm Beach labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$63–$82

Outdoor crews in Palm Beach County · +16% vs U.S. ($62/hr)

Typical crew

3 × 7.5 days

On-site time for a typical pool cage job here.

Labor in the price

$12,900

58% of the median — the rest is material, disposal and permit.

Because labor is 58% of this job, West Palm Beach wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national outdoor crew rates adjusted by the Palm Beach County labor factor (x1.156). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why West Palm Beach differs from the national average

The local delta, broken into dollars by driver.

Code and inspection load$1,725Trade labor rates$1,625Material and delivery$725Permit fees$100
Dollars of the West Palm Beach difference owned by each driver, versus the U.S. median for pool enclosure / screen cage.
  • Code and inspection load+$1,725

    Pool Enclosure / Screen Cage carries 80% exposure to local code requirements, and this jurisdiction's review load indexes at x1.12.

  • Trade labor rates+$1,625

    Palm Beach County crews price 16% above the national average, and labor is 58% of this job.

  • Material and delivery+$725

    Materials are nationally traded, so they move less — but delivery into this market runs 10% over baseline because of coastal logistics.

  • Permit fees+$100

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

Basis: Decomposition of the modeled West Palm Beach median against the U.S. median for this scope. · City of West Palm Beach building department, Hometriva methodology

West Palm Beach vs Florida vs the U.S.

West Palm Beach$11,200$52,100Florida average$10,100$47,000U.S. average$9,000$42,000
Modeled ranges for pool enclosure / screen cage. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated pool enclosure / screen cage in West Palm Beach

$22,840

Likely range $11,740$52,640

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Enclosure footprint and height
  • Mansard versus gable roof style
  • Screen type including no-see-um and pet screen
  • Design wind speed for the parcel
  • Existing deck footing capacity

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of West Palm Beach building departmentModeled estimate
electricalCity of West Palm Beach building departmentModeled estimate
mechanicalCity of West Palm Beach building departmentModeled estimate
plumbingCity of West Palm Beach building departmentModeled estimate
zoningCity of West Palm Beach building departmentModeled estimate
fireCity of West Palm Beach building departmentModeled estimate

Permit requirement in West Palm Beach

Yes — a permit is required for pool enclosure / screen cage in West Palm Beach, FL. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Permitting authority
City of West Palm Beach building departmentModeled estimate
Permit fee
Based on declared project valuationSee the department's adopted fee schedule. Typical range for this scope: $220$855.

Inspections

  1. Footing / anchor inspection
  2. Framing inspection
  3. Final inspection
Full West Palm Beach permit guide for pool enclosure / screen cage

Local conditions that change this job

Only the exposures that materially affect pool enclosure / screen cage.

Design wind speed exposure

Severe92/100

Named-storm exposure

Severe90/100

Cooling load / heat exposure

Severe89/100

Nearby market comparison

MarketLocal factorMedianPer sq ft of enclosure
West Palm Beach (this page)x1.240$22,300$22.50$49.50
Fort Lauderdalex1.285$23,100$23$51.50
Port St. Luciex1.086$19,500$19.50$43.50
Miamix1.346$24,200$24$54

What West Palm Beach homeowners actually paid

Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in West Palm Beach

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates West Palm Beach pool cage costs

Hometriva does not publish invented city prices. The West Palm Beach estimate for pool enclosure / screen cage is produced by this chain, and every input is stored separately:

  1. National baseline$18,000

    Typical U.S. cost for pool enclosure / screen cage on a single-family home.

  2. Local labor factorx1.156

    West Palm Beach-area trade labor rates, weighted at 58% of this job.

  3. Material factorx1.097

    Material and delivery pricing into Palm Beach County, weighted at 42%.

  4. Regulatory factorx1.120

    Local code, product-approval and inspection load, applied at 80% for this project type.

  5. Applied multiplierx1.240

    Blended West Palm Beach adjustment specific to pool enclosure / screen cage.

  6. Permit component$220 – $855

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, pool enclosure / screen cage in West Palm Beach carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for pool enclosure / screen cage pricing in West Palm Beach, FL.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

Do I need a permit for a pool cage?

Yes. Screen enclosures are engineered structures in Florida and require a building permit with signed and sealed plans plus wind-load calculations.

Do I need a permit for pool enclosure / screen cage in West Palm Beach, FL?

In most jurisdictions this work is permitted and inspected. Requirements are set locally, so confirm the current application and inspection checklist with your building department before work starts.

How long does pool enclosure / screen cage take?

1-2 weeks of work, 4-10 weeks including engineering and permitting. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are enclosure footprint and height; mansard versus gable roof style; screen type including no-see-um and pet screen.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.

Related pages