Florida · Outdoor
Pool Enclosure / Screen Cage cost in Florida
Statewide pricing, permit posture and inspection sequence for pool enclosure / screen cage in Florida. Your city or county issues the actual permit — use the local links below to confirm fees.
Verified August 2026
Pool Enclosure / Screen Cage cost in Florida
$9,400 – $43,700
Most Florida homeowners pay around $18,700, or $18.50–$41.50 per sq ft of enclosure. Permit fees typically add $205–$805.
Permit: Yes. Florida Building Code, 8th Edition (2023)
Cost breakdown
| Budget scope | $9,400 |
|---|---|
| Typical project | $18,700 |
| Premium / complex | $43,700 |
| per sq ft of enclosure | $18.50 – $41.50 |
| Permit fees | $205 – $805 |
| vs national baseline | +4% |
| Timeline | 1-2 weeks of work, 4-10 weeks including engineering and permitting |
What is different about pool enclosure / screen cage in Florida
One statewide code is enforced by 67 counties and 411 municipalities, and wind-borne debris, product approval and flood 50% rules change the scope of nearly every exterior project.
Owner-builder: Owner-builder exemption available on an owner-occupied home under FS 489.103(7). Pool Enclosure / Screen Cage generally requires a licensed contractor to pull the permit, even where owner-builder status is available.
Inspections
- Footing / anchor inspection
- Framing inspection
- Final inspection
What drives the price
- Enclosure footprint and height
- Mansard versus gable roof style
- Screen type including no-see-um and pet screen
- Design wind speed for the parcel
- Existing deck footing capacity
Pool Cage pricing by city
Frequently asked questions
Do I need a permit for a pool cage?
Yes. Screen enclosures are engineered structures in Florida and require a building permit with signed and sealed plans plus wind-load calculations.
Sources
Sources & verification
Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.
