Alabama · Outdoor

Pool Enclosure / Screen Cage cost in Alabama

Statewide pricing, permit posture and inspection sequence for pool enclosure / screen cage in Alabama. Your city or county issues the actual permit — use the local links below to confirm fees.

Verified August 2026

Pool Enclosure / Screen Cage cost in Alabama

$8,100 – $37,800

Most Alabama homeowners pay around $16,200, or $16$36 per sq ft of enclosure. Permit fees typically add $155$595.

Permit: Yes. Code adoption is local — local adoption of the irc; statewide code applies to state-funded and manufactured housing.

Cost breakdown

Budget scope$8,100
Typical project$16,200
Premium / complex$37,800
per sq ft of enclosure$16 – $36
Permit fees$155 – $595
vs national baseline-10%
Timeline1-2 weeks of work, 4-10 weeks including engineering and permitting

What is different about pool enclosure / screen cage in Alabama

Coastal Baldwin and Mobile counties enforce wind-borne debris requirements that inland Alabama does not, which changes roofing and window pricing sharply within one state.

Owner-builder: Homeowners may generally permit work on a home they own and occupy, subject to local rules. Pool Enclosure / Screen Cage generally requires a licensed contractor to pull the permit, even where owner-builder status is available.

Inspections

  • Footing / anchor inspection
  • Framing inspection
  • Final inspection

What drives the price

  • Enclosure footprint and height
  • Mansard versus gable roof style
  • Screen type including no-see-um and pet screen
  • Design wind speed for the parcel
  • Existing deck footing capacity

Frequently asked questions

Do I need a permit for a pool cage?

Yes. Screen enclosures are engineered structures in Florida and require a building permit with signed and sealed plans plus wind-load calculations.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.