Roof Replacement cost in Honolulu, HI

Honolulu, HI · updated August 2026

$29,100

Typical local cost

$16,900 – $56,900

Typical range

per sq ft of roof area
$10 – $25

Installed, local pricing

Permit
Yes

$220 – $925 in fees

Typical timeline
1-3 days of work

1-3 days of work, 2-6 weeks including permitting and inspections

Calculate my roof cost

Honolulu runs +78% against the U.S. average · data confidence High · modeled estimate, not a quote

The modeled midpoint for Honolulu is $29,100. The local adjustment for this trade is x1.777 — driven mainly by Honolulu County labor rates and 100% exposure to local code requirements.

Estimate your Honolulu job

Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.

Ground-floor area under the roof, not total living area.

Estimated total cost

$30,703 – $43,094

Installed, including tear-off and permit

Roof area
2,464 sq ft
Roofing squares
24.6
Cost per square foot
$12 – $18
Tear-off allowance
$5,036

Priced for Honolulu (local adjustment x1.777).

Estimates only. Local pricing, site conditions and code requirements change the real number.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
1,000 sq ft of roof area$10,000$25,000
1,300 sq ft of roof area$13,000$32,500
1,700 sq ft of roof area$17,000$42,500
2,200 sq ft of roof area$22,000$55,000
2,900 sq ft of roof area$29,000$72,500

Based on Honolulu pricing of $10–$25 per sq ft of roof area.

Cost by roof scope

Roof pricing moves on area, pitch, how many layers come off and what the deck looks like underneath. Every row is priced against the Honolulu median.

ScopeWhat it includesTypical installed cost
Overlay on a simple ranch roofSingle layer, 4:12 pitch, no tear-off$18,000$23,900
Standard tear-off and replaceOne layer removed, architectural shingle, walkable pitch$24,700$33,500
Two-layer tear-offExtra removal and disposal, same footprint$29,100$39,300
Steep or cut-up roof8:12+ pitch, multiple valleys, dormers, staging$36,400$49,500
Replacement with deck repairPartial resheathing found after tear-off$33,500$46,600
  • Tear-off and disposal is priced per layer — quotes that omit a second layer are the most common source of change orders.
  • Decking is unknown until the old roof is off. Reputable quotes state a per-sheet resheathing price up front.
  • Pitch above 7:12 requires fall protection and slows the crew, which shows up as labor, not material.

Basis: Each scope is priced as a multiple of the modeled Honolulu median for roof replacement, so the scenarios, the size table and the calculator always agree. · Hometriva methodology

Cost by material

Installed cost in this market, with expected service life.

MaterialInstalled rangeLifespanMaintenance
3-Tab Asphalt Shingles$17,500 $25,6001220 yrsModerate
Architectural Asphalt Shingles$24,700 $34,9002230 yrsLow
Standing-Seam Metal Roof$43,700 $69,8004070 yrsVery low
Concrete or Clay Tile Roof$45,100 $75,7004060 yrsModerate
Synthetic Slate$40,700 $64,0004050 yrsLow

Where the money goes

Labor
$14,600
49% of median
Materials
$14,600
49% of median
Permit & fees
$575
2% of median

Honolulu project costs+78% vs U.S. average

Based on Honolulu County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City and County of Honolulu Department of Planning and Permitting

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    1-3 days of work, 2-6 weeks including permitting and inspections

  5. 05

    Inspection

    Dry-in / underlayment, In-progress nailing, Final roof inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Honolulu labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$110–$142

Exterior crews in Honolulu County · +83% vs U.S. ($68/hr)

Typical crew

3 × 5 days

On-site time for a typical roof job here.

Labor in the price

$14,600

50% of the median — the rest is material, disposal and permit.

Because labor is 50% of this job, Honolulu wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national exterior crew rates adjusted by the Honolulu County labor factor (x1.832). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Honolulu differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$6,825Material and delivery$3,050Code and inspection load$1,800Permit fees$100
Dollars of the Honolulu difference owned by each driver, versus the U.S. median for roof replacement.
  • Trade labor rates+$6,825

    Honolulu County crews price 83% above the national average, and labor is 50% of this job.

  • Material and delivery+$3,050

    Materials are nationally traded, so they move less — but delivery into this market runs 37% over baseline.

  • Code and inspection load+$1,800

    Roof Replacement carries 100% exposure to local code requirements, and this jurisdiction's review load indexes at x1.11.

  • Permit fees+$100

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

Basis: Decomposition of the modeled Honolulu median against the U.S. median for this scope. · City and County of Honolulu Department of Planning and Permitting, Hometriva methodology

Honolulu vs Hawaii vs the U.S.

Honolulu$16,900$56,900Hawaii average$16,500$55,700U.S. average$9,500$32,000
Modeled ranges for roof replacement. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated roof replacement in Honolulu

$29,675

Likely range $17,475$57,475

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Roof size in squares (1 square = 100 sq ft) and pitch
  • Material: 3-tab shingle, architectural shingle, metal, or tile
  • Number of tear-off layers and any decking replacement
  • Wind-uplift requirements in your county
  • Skylights, valleys, dormers and other penetrations

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permit requirement in Honolulu

Yes — a permit is required for roof replacement in Honolulu, HI. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Permitting authority
City and County of Honolulu Department of Planning and PermittingConfirmed department
Permit fee
Based on declared project valuationHonolulu is a consolidated city and county — one department permits the entire island of Oahu. Typical range for this scope: $220$925.

Inspections

  1. Dry-in / underlayment
  2. In-progress nailing
  3. Final roof inspection
Full Honolulu permit guide for roof replacement

Local conditions that change this job

Only the exposures that materially affect roof replacement.

Design wind speed exposure

High70/100

Named-storm exposure

High70/100

Cooling load / heat exposure

Severe82/100

Hail risk

Minimal18/100

Annual rainfall

High74/100

Honolulu sits in Honolulu County, Hawaii. Coastal wind design and salt-air corrosion raise material specifications for roofing, fasteners, siding and mechanical equipment. Work outside city limits is permitted by the county building department rather than the city.

Owner-occupied homes

0%

Owner-occupied share of the housing stock, which drives how much of this work is homeowner-funded versus landlord-funded.

Households in market

137,368

Approximate household count in Honolulu, used to size the contractor pool for this trade.

Permit activity index

x1.23

Relative permit volume and fee load versus the national baseline.

Nearby market comparison

MarketLocal factorMedianPer sq ft of roof area
Honolulu (this page)x1.777$29,100$10$25
Kailuax1.690$27,700$9.50$23.50
Kahuluix1.690$27,700$9.50$23.50

What Honolulu homeowners actually paid

Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Honolulu

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Honolulu roof costs

Hometriva does not publish invented city prices. The Honolulu estimate for roof replacement is produced by this chain, and every input is stored separately:

  1. National baseline$16,400

    Typical U.S. cost for roof replacement on a single-family home.

  2. Local labor factorx1.832

    Honolulu-area trade labor rates, weighted at 50% of this job.

  3. Material factorx1.373

    Material and delivery pricing into Honolulu County, weighted at 50%.

  4. Regulatory factorx1.109

    Local code, product-approval and inspection load, applied at 100% for this project type.

  5. Applied multiplierx1.777

    Blended Honolulu adjustment specific to roof replacement.

  6. Permit component$220 – $925

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, roof replacement in Honolulu carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for roof replacement pricing in Honolulu, HI.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

How long does a roof replacement take?

Most single-family asphalt shingle roofs are torn off and re-covered in one to three working days. Tile and metal roofs typically take three to seven days. The overall timeline, including permit issuance and final inspection, is usually two to six weeks.

Do I need a permit for roof replacement in Honolulu, HI?

In most jurisdictions this work is permitted and inspected. Requirements are set locally, so confirm the current application and inspection checklist with your building department before work starts.

How long does roof replacement take?

1-3 days of work, 2-6 weeks including permitting and inspections. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are roof size in squares (1 square = 100 sq ft) and pitch; material: 3-tab shingle, architectural shingle, metal, or tile; number of tear-off layers and any decking replacement.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.

Related pages