Roof Replacement cost in Idaho Falls, ID

Idaho Falls, ID · updated August 2026

$16,000

Typical local cost

$9,300 – $31,300

Typical range

per sq ft of roof area
$5.50 – $13.50

Installed, local pricing

Permit
Yes

$160 – $660 in fees

Typical timeline
1-3 days of work

1-3 days of work, 2-6 weeks including permitting and inspections

Calculate my roof cost

Idaho Falls runs -2% against the U.S. average · data confidence High · modeled estimate, not a quote

The modeled midpoint for Idaho Falls is $16,000. The local adjustment for this trade is x0.977 — driven mainly by Bonneville County labor rates and 100% exposure to local code requirements.

Estimate your Idaho Falls job

Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.

Ground-floor area under the roof, not total living area.

Estimated total cost

$16,881 – $23,693

Installed, including tear-off and permit

Roof area
2,464 sq ft
Roofing squares
24.6
Cost per square foot
$7 – $10
Tear-off allowance
$2,769

Priced for Idaho Falls (local adjustment x0.977).

Estimates only. Local pricing, site conditions and code requirements change the real number.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
1,000 sq ft of roof area$5,500$13,500
1,300 sq ft of roof area$7,200$17,600
1,700 sq ft of roof area$9,400$23,000
2,200 sq ft of roof area$12,100$29,700
2,900 sq ft of roof area$16,000$39,200

Based on Idaho Falls pricing of $6–$14 per sq ft of roof area.

Cost by roof scope

Roof pricing moves on area, pitch, how many layers come off and what the deck looks like underneath. Every row is priced against the Idaho Falls median.

ScopeWhat it includesTypical installed cost
Overlay on a simple ranch roofSingle layer, 4:12 pitch, no tear-off$9,900$13,100
Standard tear-off and replaceOne layer removed, architectural shingle, walkable pitch$13,600$18,400
Two-layer tear-offExtra removal and disposal, same footprint$16,000$21,600
Steep or cut-up roof8:12+ pitch, multiple valleys, dormers, staging$20,000$27,200
Replacement with deck repairPartial resheathing found after tear-off$18,400$25,600
  • Tear-off and disposal is priced per layer — quotes that omit a second layer are the most common source of change orders.
  • Decking is unknown until the old roof is off. Reputable quotes state a per-sheet resheathing price up front.
  • Pitch above 7:12 requires fall protection and slows the crew, which shows up as labor, not material.

Basis: Each scope is priced as a multiple of the modeled Idaho Falls median for roof replacement, so the scenarios, the size table and the calculator always agree. · Hometriva methodology

Cost by material

Installed cost in this market, with expected service life.

MaterialInstalled rangeLifespanMaintenance
3-Tab Asphalt Shingles$9,600 $14,1001220 yrsModerate
Architectural Asphalt Shingles$13,600 $19,2002230 yrsLow
Standing-Seam Metal Roof$24,000 $38,4004070 yrsVery low
Concrete or Clay Tile Roof$24,800 $41,6004060 yrsModerate
Synthetic Slate$22,400 $35,2004050 yrsLow

Where the money goes

Labor
$8,000
49% of median
Materials
$8,000
49% of median
Permit & fees
$410
2% of median

Idaho Falls project costs-2% vs U.S. average

Based on Bonneville County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Idaho Falls building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    1-3 days of work, 2-6 weeks including permitting and inspections

  5. 05

    Inspection

    Dry-in / underlayment, In-progress nailing, Final roof inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Idaho Falls labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$57–$73

Exterior crews in Bonneville County · -5% vs U.S. ($68/hr)

Typical crew

3 × 5 days

On-site time for a typical roof job here.

Labor in the price

$8,000

50% of the median — the rest is material, disposal and permit.

Because labor is 50% of this job, Idaho Falls wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national exterior crew rates adjusted by the Bonneville County labor factor (x0.948). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Idaho Falls differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$425Code and inspection load$125Material and delivery$50Permit fees$50
Dollars of the Idaho Falls difference owned by each driver, versus the U.S. median for roof replacement.
  • Trade labor rates-$425

    Bonneville County crews price 5% below the national average, and labor is 50% of this job.

  • Code and inspection load+$125

    Roof Replacement carries 100% exposure to local code requirements, and this jurisdiction's review load indexes at x1.01.

  • Material and delivery-$50

    Materials are nationally traded, so they move less — but delivery into this market runs 1% under baseline.

  • Permit fees-$50

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

Basis: Decomposition of the modeled Idaho Falls median against the U.S. median for this scope. · City of Idaho Falls building department, Hometriva methodology

Idaho Falls vs Idaho vs the U.S.

Idaho Falls$9,300$31,300Idaho average$9,300$31,300U.S. average$9,500$32,000
Modeled ranges for roof replacement. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated roof replacement in Idaho Falls

$16,410

Likely range $9,710$31,710

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Roof size in squares (1 square = 100 sq ft) and pitch
  • Material: 3-tab shingle, architectural shingle, metal, or tile
  • Number of tear-off layers and any decking replacement
  • Wind-uplift requirements in your county
  • Skylights, valleys, dormers and other penetrations

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Idaho Falls building departmentModeled estimate
electricalCity of Idaho Falls building departmentModeled estimate
mechanicalCity of Idaho Falls building departmentModeled estimate
plumbingCity of Idaho Falls building departmentModeled estimate
zoningCity of Idaho Falls building departmentModeled estimate
fireCity of Idaho Falls building departmentModeled estimate

Permit requirement in Idaho Falls

Yes — a permit is required for roof replacement in Idaho Falls, ID. The work must be inspected before it can be closed out, and a licensed contractor generally has to pull the permit.

Permitting authority
City of Idaho Falls building departmentModeled estimate
Permit fee
Estimated allowance $160$660Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Dry-in / underlayment
  2. In-progress nailing
  3. Final roof inspection
Full Idaho Falls permit guide for roof replacement

Local conditions that change this job

Only the exposures that materially affect roof replacement.

Design wind speed exposure

High70/100

Named-storm exposure

High70/100

Cooling load / heat exposure

Severe82/100

Hail risk

Minimal18/100

Annual rainfall

High74/100

Idaho Falls sits in Bonneville County, Idaho. Snow load, hail and deep freeze-thaw cycling drive roofing, insulation and exterior envelope specifications well above Sun Belt minimums. Work outside city limits is permitted by the county building department rather than the city.

Owner-occupied homes

0%

Owner-occupied share of the housing stock, which drives how much of this work is homeowner-funded versus landlord-funded.

Households in market

27,302

Approximate household count in Idaho Falls, used to size the contractor pool for this trade.

Permit activity index

x0.88

Relative permit volume and fee load versus the national baseline.

Nearby market comparison

MarketLocal factorMedianPer sq ft of roof area
Idaho Falls (this page)x0.977$16,000$5.50$13.50
Pocatellox0.935$15,300$5$13
Twin Fallsx0.935$15,300$5$13

What Idaho Falls homeowners actually paid

Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Idaho Falls

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Idaho Falls roof costs

Hometriva does not publish invented city prices. The Idaho Falls estimate for roof replacement is produced by this chain, and every input is stored separately:

  1. National baseline$16,400

    Typical U.S. cost for roof replacement on a single-family home.

  2. Local labor factorx0.948

    Idaho Falls-area trade labor rates, weighted at 50% of this job.

  3. Material factorx0.993

    Material and delivery pricing into Bonneville County, weighted at 50%.

  4. Regulatory factorx1.007

    Local code, product-approval and inspection load, applied at 100% for this project type.

  5. Applied multiplierx0.977

    Blended Idaho Falls adjustment specific to roof replacement.

  6. Permit component$160 – $660

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, roof replacement in Idaho Falls carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for roof replacement pricing in Idaho Falls, ID.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

How long does a roof replacement take?

Most single-family asphalt shingle roofs are torn off and re-covered in one to three working days. Tile and metal roofs typically take three to seven days. The overall timeline, including permit issuance and final inspection, is usually two to six weeks.

Do I need a permit for roof replacement in Idaho Falls, ID?

In most jurisdictions this work is permitted and inspected. Requirements are set locally, so confirm the current application and inspection checklist with your building department before work starts.

How long does roof replacement take?

1-3 days of work, 2-6 weeks including permitting and inspections. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are roof size in squares (1 square = 100 sq ft) and pitch; material: 3-tab shingle, architectural shingle, metal, or tile; number of tear-off layers and any decking replacement.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.