Tub to Shower Conversion cost in Edmond, OK

Edmond, OK · updated August 2026

$6,300

Typical local cost

$3,000 – $13,900

Typical range

per conversion
$3,050 – $13,900

Installed, local pricing

Permit
Usually yes

$75 – $260 in fees

Typical timeline
3-7 days of work

3-7 days of work, 2-5 weeks including permitting

Calculate my tub to shower cost

Edmond runs -13% against the U.S. average · data confidence Medium · modeled estimate, not a quote

The modeled midpoint for Edmond is $6,300. The local adjustment for this trade is x0.870 — driven mainly by Oklahoma County labor rates and 40% exposure to local code requirements.

Estimate your Edmond job

Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.

Tiles needed

57 tiles

Includes 12% waste

Boxes to buy
8 boxes
Thinset (50 lb bags)
2 bags
Grout (25 lb bags)
1 bags
Tile cost estimateMaterial only
$244 – $877

Priced for Edmond (local adjustment x0.870).

Estimates only. Local pricing, site conditions and code requirements change the real number.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
Acrylic alcove unit$2,300$10,400
Tiled shower$3,000$13,900
Tile with glass enclosure$3,900$18,100
Curbless / roll-in shower$5,100$23,600

Based on Edmond pricing of $3,050–$13,900 per conversion.

Where the money goes

Labor
$3,900
60% of median
Materials
$2,400
37% of median
Permit & fees
$170
3% of median

Edmond project costs-13% vs U.S. average

Based on Oklahoma County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Edmond building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    3-7 days of work, 2-5 weeks including permitting

  5. 05

    Inspection

    Plumbing rough-in, Shower pan water test, Final inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Edmond labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$77–$99

Plumbing crews in Oklahoma County · -17% vs U.S. ($105/hr)

Typical crew

2 × 3 days

On-site time for a typical tub to shower job here.

Labor in the price

$3,900

62% of the median — the rest is material, disposal and permit.

Because labor is 62% of this job, Edmond wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national plumbing crew rates adjusted by the Oklahoma County labor factor (x0.831). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Edmond differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$750Material and delivery$150Permit fees$25Code and inspection load$25
Dollars of the Edmond difference owned by each driver, versus the U.S. median for tub to shower conversion.
  • Trade labor rates-$750

    Oklahoma County crews price 17% below the national average, and labor is 62% of this job.

  • Material and delivery-$150

    Materials are nationally traded, so they move less — but delivery into this market runs 6% under baseline.

  • Permit fees-$25

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

  • Code and inspection load-$25

    Tub to Shower Conversion carries 40% exposure to local code requirements, and this jurisdiction's review load indexes at x0.99.

Basis: Decomposition of the modeled Edmond median against the U.S. median for this scope. · City of Edmond building department, Hometriva methodology

Edmond vs Oklahoma vs the U.S.

Edmond$3,000$13,900Oklahoma average$3,000$13,900U.S. average$3,500$16,000
Modeled ranges for tub to shower conversion. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated tub to shower conversion in Edmond

$6,470

Likely range $3,170$14,070

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Drain relocation from tub to shower position
  • Tile versus acrylic shower base and walls
  • Glass enclosure type
  • Accessibility features such as grab bars and a bench
  • Subfloor or slab repair after demolition

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Edmond building departmentModeled estimate
electricalCity of Edmond building departmentModeled estimate
mechanicalCity of Edmond building departmentModeled estimate
plumbingCity of Edmond building departmentModeled estimate
zoningCity of Edmond building departmentModeled estimate
fireCity of Edmond building departmentModeled estimate

Permit requirement in Edmond

In most cases yes — Oklahoma County and the City of Edmond generally require a permit for tub to shower conversion. Height, size and location on the lot determine the exact review, so confirm with the building department before you start.

Permitting authority
City of Edmond building departmentModeled estimate
Permit fee
Estimated allowance $75$260Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Plumbing rough-in
  2. Shower pan water test
  3. Final inspection
Full Edmond permit guide for tub to shower conversion

Local conditions that change this job

Only the exposures that materially affect tub to shower conversion.

Humidity

Severe84/100

Nearby market comparison

MarketLocal factorMedianPer conversion
Edmond (this page)x0.870$6,300$3,050$13,900
Oklahoma Cityx0.909$6,500$3,200$14,550
Moorex0.870$6,300$3,050$13,900
Normanx0.870$6,300$3,050$13,900

What Edmond homeowners actually paid

Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Edmond

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Edmond tub to shower costs

Hometriva does not publish invented city prices. The Edmond estimate for tub to shower conversion is produced by this chain, and every input is stored separately:

  1. National baseline$7,200

    Typical U.S. cost for tub to shower conversion on a single-family home.

  2. Local labor factorx0.831

    Edmond-area trade labor rates, weighted at 62% of this job.

  3. Material factorx0.943

    Material and delivery pricing into Oklahoma County, weighted at 38%.

  4. Regulatory factorx0.989

    Local code, product-approval and inspection load, applied at 40% for this project type.

  5. Applied multiplierx0.870

    Blended Edmond adjustment specific to tub to shower conversion.

  6. Permit component$75 – $260

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, tub to shower conversion in Edmond carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for tub to shower conversion pricing in Edmond, OK.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

How long does tub to shower conversion take?

3-7 days of work, 2-5 weeks including permitting. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are drain relocation from tub to shower position; tile versus acrylic shower base and walls; glass enclosure type.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.

Related pages