Tub to Shower Conversion cost in Portland, OR

Portland, OR · updated August 2026

$8,900

Typical local cost

$4,300 – $19,800

Typical range

per conversion
$4,350 – $19,800

Installed, local pricing

Permit
Usually yes

$115 – $410 in fees

Typical timeline
3-7 days of work

3-7 days of work, 2-5 weeks including permitting

Calculate my tub to shower cost

Portland runs +24% against the U.S. average · data confidence Medium · modeled estimate, not a quote

The modeled midpoint for Portland is $8,900. The local adjustment for this trade is x1.238 — driven mainly by Multnomah County labor rates and 40% exposure to local code requirements.

Estimate your Portland job

Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.

Tiles needed

57 tiles

Includes 12% waste

Boxes to buy
8 boxes
Thinset (50 lb bags)
2 bags
Grout (25 lb bags)
1 bags
Tile cost estimateMaterial only
$347 – $1,248

Priced for Portland (local adjustment x1.238).

Estimates only. Local pricing, site conditions and code requirements change the real number.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
Acrylic alcove unit$3,200 – $14,900
Tiled shower$4,300 – $19,800
Tile with glass enclosure$5,600 – $25,700
Curbless / roll-in shower$7,300 – $33,700

Based on Portland pricing of $4,350–$19,800 per conversion.

Where the money goes

Labor
$5,500
60% of median
Materials
$3,400
37% of median
Permit & fees
$265
3% of median

Portland project costs+24% vs U.S. average

Based on Multnomah County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Portland building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    3-7 days of work, 2-5 weeks including permitting

  5. 05

    Inspection

    Plumbing rough-in, Shower pan water test, Final inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Portland labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$114–$148

Plumbing crews in Multnomah County · +23% vs U.S. ($105/hr)

Typical crew

2 × 2.5 days

On-site time for a typical tub to shower job here.

Labor in the price

$5,500

62% of the median — the rest is material, disposal and permit.

Because labor is 62% of this job, Portland wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national plumbing crew rates adjusted by the Multnomah County labor factor (x1.234). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Portland differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$1,050Code and inspection load$300Material and delivery$300Permit fees$50
Dollars of the Portland difference owned by each driver, versus the U.S. median for tub to shower conversion.
  • Trade labor rates+$1,050

    Multnomah County crews price 23% above the national average, and labor is 62% of this job.

  • Code and inspection load+$300

    Tub to Shower Conversion carries 40% exposure to local code requirements, and this jurisdiction's review load indexes at x1.11.

  • Material and delivery+$300

    Materials are nationally traded, so they move less — but delivery into this market runs 11% over baseline.

  • Permit fees+$50

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

Basis: Decomposition of the modeled Portland median against the U.S. median for this scope. · City of Portland building department, Hometriva methodology

Portland vs Oregon vs the U.S.

Portland$4,300–$19,800Oregon average$4,200–$19,000U.S. average$3,500–$16,000
Modeled ranges for tub to shower conversion. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated tub to shower conversion in Portland

$9,165

Likely range $4,565 – $20,065

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Drain relocation from tub to shower position
  • Tile versus acrylic shower base and walls
  • Glass enclosure type
  • Accessibility features such as grab bars and a bench
  • Subfloor or slab repair after demolition

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Portland building departmentModeled estimate
electricalCity of Portland building departmentModeled estimate
mechanicalCity of Portland building departmentModeled estimate
plumbingCity of Portland building departmentModeled estimate
zoningCity of Portland building departmentModeled estimate
fireCity of Portland building departmentModeled estimate

Permit requirement in Portland

In most cases yes — Multnomah County and the City of Portland generally require a permit for tub to shower conversion. Height, size and location on the lot determine the exact review, so confirm with the building department before you start.

Permitting authority
City of Portland building departmentModeled estimate
Permit fee
Estimated allowance $115–$410Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Plumbing rough-in
  2. Shower pan water test
  3. Final inspection
Full Portland permit guide for tub to shower conversion →

Local conditions that change this job

Only the exposures that materially affect tub to shower conversion.

Humidity

High70/100

Nearby market comparison

MarketLocal factorMedianPer conversion
Portland (this page)x1.238$8,900$4,350 – $19,800
Beavertonx1.188$8,600$4,150 – $19,000
Hillsborox1.188$8,600$4,150 – $19,000
Vancouverx1.234$8,900$4,300 – $19,750
+ Had tub to shower conversion done in Portland? Add what you paid or were quoted

Reports are reviewed before they count, and nothing is published until at least 5 reports exist for a market. No name, email or address is collected.

No name, email or address is collected. Reports are reviewed before they count.
No name, email or address is collected.

How Hometriva estimates Portland tub to shower costs

Hometriva does not publish invented city prices. The Portland estimate for tub to shower conversion is produced by this chain, and every input is stored separately:

  1. National baseline$7,200

    Typical U.S. cost for tub to shower conversion on a single-family home.

  2. Local labor factorx1.234

    Portland-area trade labor rates, weighted at 62% of this job.

  3. Material factorx1.109

    Material and delivery pricing into Multnomah County, weighted at 38%.

  4. Regulatory factorx1.108

    Local code, product-approval and inspection load, applied at 40% for this project type.

  5. Applied multiplierx1.238

    Blended Portland adjustment specific to tub to shower conversion.

  6. Permit component$115 – $410

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, tub to shower conversion in Portland carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for tub to shower conversion pricing in Portland, OR.

  • • National unit-cost baselines against current trade pricing
  • • Local labor and materials factors for the market
  • • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

How long does tub to shower conversion take?

3-7 days of work, 2-5 weeks including permitting. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are drain relocation from tub to shower position; tile versus acrylic shower base and walls; glass enclosure type.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.

Related pages