Plumbing

Whole-House Repipe: Cost, Permits & Timeline

Replacing the supply plumbing throughout a house, typically from failing polybutylene or corroded copper to PEX or CPVC.

Verified August 2026

Typical cost

$8,200

$4,500 – $16,000

per house repiped

$4,500 – $16,000

Permit

Required

$120 – $450

Timeline

3-6 days of work

3-6 days of work, 2-5 weeks including inspections and drywall repair

Do you need a permit for whole-house repipe?

Yes

Whole-House Repipe is permitted and inspected work in nearly every jurisdiction. Typical fees run $120 to $450, and a licensed contractor generally has to pull the permit.

What drives the cost

  • Number of bathrooms and fixtures
  • Slab versus attic routing
  • PEX versus CPVC versus copper
  • Drywall cutting and patching
  • House square footage and stories

Permit, inspections and documents

Permit statusrequired
Typical permit fee$120 – $450
Licensed contractor requiredUsually yes
Owner-builder allowedYes, on owner-occupied homes
InspectionsRough plumbing / pressure test, Drywall patch, Final inspection
Timeline3-6 days of work, 2-5 weeks including inspections and drywall repair
DIY difficulty5/5 difficulty

Documents typically required

  • Plumbing permit application
  • Licensed plumbing contractor information
  • Scope and material specification

Whole-House Repipe cost by city

Local labor and material pricing applied to the national baseline.

CityTypical rangevs national
Miami$5,300$18,900+18%
Tampa$4,700$16,600+4%
Orlando$4,600$16,300+2%
Fort Lauderdale$5,100$18,200+14%
Jacksonville$4,300$15,400-4%
West Palm Beach$5,000$17,900+12%
St. Petersburg$4,600$16,500+3%
Fort Myers$4,900$17,400+9%
Cape Coral$4,800$17,100+7%
Sarasota$4,900$17,300+8%
Naples$5,600$19,800+24%
Port St. Lucie$4,600$16,300+2%

Frequently asked questions

Do I need a permit to repipe a house?

Yes. A whole-house repipe is major plumbing work and requires a permit, a pressure test inspection and a final inspection in every Florida jurisdiction.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.