Treasure Coast & Space Coast
Driveway Replacement in Martin County, Florida
Permit requirements, inspections and modeled costs for driveway replacement in unincorporated Martin County. If your address falls inside a city, the municipal building department issues the permit instead.
Verified August 2026
Do you need a permit for driveway replacement in Martin County?
Usually yes
In most cases yes — Martin County and the City of Unincorporated Martin County generally require a permit for driveway replacement. Height, size and location on the lot determine the exact review, so confirm with the building department before you start.
Budget $4,300 – $19,400 for the work itself (typically $8,800) plus $95–$415 in permit fees.
Martin County cost model
| Budget scope | $4,300 |
|---|---|
| Typical project | $8,800 |
| Premium / complex | $19,400 |
| per sq ft of driveway | $6 – $22.50 |
| Permit fees | $95 – $415 |
| vs national baseline | +2% |
| Timeline | 2-4 days of work plus 7 days of concrete cure, 2-5 weeks total |
Inspections you should expect
- Form / subgrade inspection
- Final inspection
What the county will ask for
- Permit application
- Site plan with dimensions and impervious area
- Right-of-way permit for apron work
Cities inside the county that permit their own work
If the property is inside these municipalities, apply to the city rather than the county.
We track 4 municipalities in Martin County: Stuart, Jupiter Island, Sewall's Point, Ocean Breeze. Contact the city directly if your address is inside one of them.
Statewide rules that apply here
Martin County enforces the 8th Edition (2023) Florida Building Code, effective December 31, 2023. Local amendments can add requirements but cannot reduce the statewide minimum.
Frequently asked questions
Do I need a permit to replace a driveway?
Most Florida cities require a permit for driveway replacement or expansion because of impervious surface limits and stormwater rules. Work touching the apron in the right-of-way usually needs a separate right-of-way permit.
Sources
Sources & verification
Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.
