Silver Spring, MD · Montgomery County

Driveway Replacement in Silver Spring, MD: Cost & Permits

What driveway replacement actually costs in Silver Spring, whether you need a permit, which inspections apply, and how long the job takes.

Model reviewed August 2026

Typical local cost

$10,000

$4,900 – $22,000

per sq ft of driveway

$7 – $25.50

Permit fee

$90 – $385

Modeled allowance

vs national

+16%

local labor & materials

Looking for pricing detail? The full driveway replacement cost breakdown for Silver Spring covers cost by size and material, the local cost model and nearby markets.

Do you need a permit for driveway replacement in Silver Spring, MD?

Usually yes

In most cases yes — Montgomery County and the City of Silver Spring generally require a permit for driveway replacement. Height, size and location on the lot determine the exact review, so confirm with the building department before you start.

Silver Spring sits in Montgomery County, Maryland. Deep frost lines, snow load and a very old housing stock mean permits frequently touch structural, electrical and energy-code upgrades at once. Work outside city limits is permitted by the county building department rather than the city.

Cost breakdown in Silver Spring

Low endSimple scope, competitive bid$4,900
TypicalMost homeowners land here$10,000
High endComplex access, premium materials$22,000
per sq ft of driveway$7 – $25.50
Permit feeEstimated allowance $90$385Modeled from comparable fee schedules — not an official quoted fee.
Permit authorityCity of Silver Spring building departmentModeled estimate
Timeline2-4 days of work plus 7 days of concrete cure, 2-5 weeks total

Math: national median $8,600 × 1.163 = $10,000 in Silver Spring+16% versus the national model. The multiplier blends local labor and material costs with this project's labor share, so it is not the same as the city's overall cost index (1.12). Permit fees use a 1.10 local multiplier. Estimates, not quotes.

What drives your price here

  • Square footage and thickness
  • Concrete versus pavers versus asphalt
  • Demolition and haul-off of the old surface
  • Base preparation and drainage
  • Apron work in the public right-of-way

Permit process and inspections

Permit requiredUsually yes
Who pulls itContractor or owner-builder
InspectionsForm / subgrade inspection, Final inspection
DocumentsPermit application, Site plan with dimensions and impervious area, Right-of-way permit for apron work
ApplySilver Spring building department (no verified online portal on file)

Frequently asked questions

How long does driveway replacement take?

2-4 days of work plus 7 days of concrete cure, 2-5 weeks total. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are square footage and thickness; concrete versus pavers versus asphalt; demolition and haul-off of the old surface.

Driveway costs in nearby cities

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.