Typical local cost
$10,000
$4,900 – $22,000
per sq ft of driveway
$7 – $25.50
Permit fee
$90 – $385
Modeled allowance
vs national
+16%
local labor & materials
Looking for pricing detail? The full driveway replacement cost breakdown for Silver Spring covers cost by size and material, the local cost model and nearby markets.
Do you need a permit for driveway replacement in Silver Spring, MD?
Usually yes
In most cases yes — Montgomery County and the City of Silver Spring generally require a permit for driveway replacement. Height, size and location on the lot determine the exact review, so confirm with the building department before you start.
Silver Spring sits in Montgomery County, Maryland. Deep frost lines, snow load and a very old housing stock mean permits frequently touch structural, electrical and energy-code upgrades at once. Work outside city limits is permitted by the county building department rather than the city.
Cost breakdown in Silver Spring
| Low endSimple scope, competitive bid | $4,900 |
|---|---|
| TypicalMost homeowners land here | $10,000 |
| High endComplex access, premium materials | $22,000 |
| per sq ft of driveway | $7 – $25.50 |
| Permit fee | Estimated allowance $90–$385Modeled from comparable fee schedules — not an official quoted fee. |
| Permit authority | City of Silver Spring building departmentModeled estimate |
| Timeline | 2-4 days of work plus 7 days of concrete cure, 2-5 weeks total |
Math: national median $8,600 × 1.163 = $10,000 in Silver Spring — +16% versus the national model. The multiplier blends local labor and material costs with this project's labor share, so it is not the same as the city's overall cost index (1.12). Permit fees use a 1.10 local multiplier. Estimates, not quotes.
What drives your price here
- Square footage and thickness
- Concrete versus pavers versus asphalt
- Demolition and haul-off of the old surface
- Base preparation and drainage
- Apron work in the public right-of-way
Permit process and inspections
| Permit required | Usually yes |
|---|---|
| Who pulls it | Contractor or owner-builder |
| Inspections | Form / subgrade inspection, Final inspection |
| Documents | Permit application, Site plan with dimensions and impervious area, Right-of-way permit for apron work |
| Apply | Silver Spring building department (no verified online portal on file) |
Frequently asked questions
How long does driveway replacement take?
2-4 days of work plus 7 days of concrete cure, 2-5 weeks total. Permit review and inspection scheduling are usually the largest source of variation.
What changes the price the most?
The largest cost drivers are square footage and thickness; concrete versus pavers versus asphalt; demolition and haul-off of the old surface.
Driveway costs in nearby cities
Sources
Sources & verification
Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.