Bathroom Remodel cost in Arlington, VA
Arlington, VA · updated August 2026
$19,700
Typical local cost
$9,600 – $44,700
Typical range
- per bathroom
- $9,600 – $44,750
- Permit
- It depends
- Typical timeline
- 3-6 weeks
Installed, local pricing
$155 – $620 in fees
3-6 weeks
Arlington runs +6% against the U.S. average · data confidence Medium · modeled estimate, not a quote
The modeled midpoint for Arlington is $19,700. The local adjustment for this trade is x1.065 — driven mainly by Arlington County labor rates and 20% exposure to local code requirements.
Estimate your Arlington job
Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.
Tiles needed
57 tiles
Includes 12% waste
- Boxes to buy
- 8 boxes
- Thinset (50 lb bags)
- 2 bags
- Grout (25 lb bags)
- 1 bags
- Tile cost estimateMaterial only
- $298 – $1,074
Priced for Arlington (local adjustment x1.065).
Estimates only. Local pricing, site conditions and code requirements change the real number.
Cost by project size
Generated from the same unit pricing the calculator uses.
| Project size | Estimated range |
|---|---|
| Powder room | $4,800 – $22,400 |
| Hall bath (35–60 sq ft) | $8,600 – $40,200 |
| Primary bath (60–100 sq ft) | $12,500 – $58,100 |
| Large primary with wet room | $17,300 – $80,500 |
Based on Arlington pricing of $9,600–$44,750 per bathroom.
Where the money goes
- Labor
- $9,900
- 49% of median
- Materials
- $9,900
- 49% of median
- Permit & fees
- $390
- 2% of median
Arlington project costs+6% vs U.S. average
Based on Arlington County labor rates, local material logistics and permit-fee posture for this trade.
What the project looks like start to finish
Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.
01
Planning & quotes
Scope, material choice, contractor selection
02
Permit application
Filed with City of Arlington building department
03
Materials & staging
Order lead time on non-stock materials
04
Installation
3-6 weeks
05
Inspection
Rough plumbing, Shower pan water test, Final inspection
06
Closeout
Final sign-off, warranty and documentation
Arlington labor intelligence
What the trade charges here, and how much of your price it is.
Loaded hourly rate
$54–$70
Interior crews in Arlington County · +6% vs U.S. ($58/hr)
Typical crew
3 × 6.5 days
On-site time for a typical bathroom job here.
Labor in the price
$9,900
50% of the median — the rest is material, disposal and permit.
Because labor is 50% of this job, Arlington wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.
Basis: Hometriva labor model: national interior crew rates adjusted by the Arlington County labor factor (x1.065). · BLS Occupational Employment and Wage Statistics, Hometriva methodology
Why Arlington differs from the national average
The local delta, broken into dollars by driver.
Trade labor rates+$600
Arlington County crews price 6% above the national average, and labor is 50% of this job.
Material and delivery+$400
Materials are nationally traded, so they move less — but delivery into this market runs 4% over baseline.
Code and inspection load+$200
Bathroom Remodel carries 20% exposure to local code requirements, and this jurisdiction's review load indexes at x1.05.
Basis: Decomposition of the modeled Arlington median against the U.S. median for this scope. · City of Arlington building department, Hometriva methodology
Arlington vs Virginia vs the U.S.
Change the inputs, see your number
The same local model, run against your job instead of the average one.
Simulated bathroom remodel in Arlington
$20,090
Likely range $9,990 – $45,090
Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.
What makes the number move
- Tub-to-shower conversion versus like-for-like replacement
- Tile area and material
- Vanity, fixtures and glass enclosure
- Whether plumbing is relocated
- Waterproofing and subfloor repair
Who issues each permit
Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.
| Discipline | Issuing authority |
|---|---|
| building | City of Arlington building departmentModeled estimate |
| electrical | City of Arlington building departmentModeled estimate |
| mechanical | City of Arlington building departmentModeled estimate |
| plumbing | City of Arlington building departmentModeled estimate |
| zoning | City of Arlington building departmentModeled estimate |
| fire | City of Arlington building departmentModeled estimate |
Permit requirement in Arlington
It depends on scope. Like-for-like cosmetic work in Arlington is often exempt, but a permit is required as soon as you change structure, plumbing, electrical or the building envelope.
- Permitting authority
- City of Arlington building departmentModeled estimate
- Permit fee
- Estimated allowance $155–$620Modeled from comparable fee schedules — not an official quoted fee.
Inspections
- Rough plumbing
- Shower pan water test
- Final inspection
Local conditions that change this job
Only the exposures that materially affect bathroom remodel.
Humidity
Severe84/100
Arlington sits in Arlington County, Virginia. Deep frost lines, snow load and a very old housing stock mean permits frequently touch structural, electrical and energy-code upgrades at once. Work outside city limits is permitted by the county building department rather than the city.
Owner-occupied homes
0%
Owner-occupied share of the housing stock, which drives how much of this work is homeowner-funded versus landlord-funded.
Households in market
93,600
Approximate household count in Arlington, used to size the contractor pool for this trade.
Permit activity index
x1.03
Relative permit volume and fee load versus the national baseline.
Nearby market comparison
| Market | Local factor | Median | Per bathroom |
|---|---|---|---|
| Arlington (this page) | x1.065 | $19,700 | $9,600 – $44,750 |
| Washington | x1.241 | $23,000 | $11,150 – $52,100 |
| Alexandria | x1.065 | $19,700 | $9,600 – $44,750 |
| Silver Spring | x1.135 | $21,000 | $10,200 – $47,650 |
What Arlington homeowners actually paid
Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.
Quotes homeowners were given in Arlington
Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.
How Hometriva estimates Arlington bathroom costs
Hometriva does not publish invented city prices. The Arlington estimate for bathroom remodel is produced by this chain, and every input is stored separately:
- National baseline$18,500
Typical U.S. cost for bathroom remodel on a single-family home.
- Local labor factorx1.065
Arlington-area trade labor rates, weighted at 50% of this job.
- Material factorx1.044
Material and delivery pricing into Arlington County, weighted at 50%.
- Regulatory factorx1.051
Local code, product-approval and inspection load, applied at 20% for this project type.
- Applied multiplierx1.065
Blended Arlington adjustment specific to bathroom remodel.
- Permit component$155 – $620
Budgeted separately from the contract price because it is paid to the jurisdiction.
Because labor, material and regulatory factors are weighted per project, bathroom remodel in Arlington carries a different local adjustment than other trades in the same market.
Reviewed by
Hometriva Cost Data Desk
Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for bathroom remodel pricing in Arlington, VA.
- • National unit-cost baselines against current trade pricing
- • Local labor and materials factors for the market
- • Material installed-cost ranges and service life
Last reviewed August 2026 · Editorial standards · Report an error
Frequently asked questions
Do I need a permit for a bathroom remodel?
Replacing a vanity, toilet or fixtures in the same location is usually permit-exempt. Rebuilding a shower pan, moving drain lines or adding circuits requires a plumbing or building permit and inspection.
How long does bathroom remodel take?
3-6 weeks. Permit review and inspection scheduling are usually the largest source of variation.
What changes the price the most?
The largest cost drivers are tub-to-shower conversion versus like-for-like replacement; tile area and material; vanity, fixtures and glass enclosure.
Sources
Sources & verification
- Virginia Department of Housing and Community Development
- BLS Occupational Employment and Wage Statistics
Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.
