Bathroom Remodel cost in Pawtucket, RI
Pawtucket, RI · updated August 2026
$21,900
Typical local cost
$10,600 – $49,700
Typical range
- per bathroom
- $10,650 – $49,700
- Permit
- It depends
- Typical timeline
- 3-6 weeks
Installed, local pricing
$165 – $660 in fees
3-6 weeks
Pawtucket runs +18% against the U.S. average · data confidence Medium · modeled estimate, not a quote
Most Pawtucket homeowners pay around $21,900. The local adjustment for this trade is x1.183 — driven mainly by Providence County labor rates and 20% exposure to local code requirements.
Estimate your Pawtucket job
Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.
Tiles needed
57 tiles
Includes 12% waste
- Boxes to buy
- 8 boxes
- Thinset (50 lb bags)
- 2 bags
- Grout (25 lb bags)
- 1 bags
- Tile cost estimateMaterial only
- $328 – $1,179
Estimates only. Local pricing, site conditions and code requirements change the real number.
Cost by project size
Generated from the same unit pricing the calculator uses.
| Project size | Estimated range |
|---|---|
| 1 bathroom | $10,700 – $49,700 |
| 1 bathroom | $10,700 – $49,700 |
| 1 bathroom | $10,700 – $49,700 |
| 1 bathroom | $10,700 – $49,700 |
| 1 bathroom | $10,700 – $49,700 |
Based on Pawtucket pricing of $10,650–$49,700 per bathroom.
Where the money goes
- Labor
- $11,000
- 49% of median
- Materials
- $11,000
- 49% of median
- Permit & fees
- $415
- 2% of median
Pawtucket project costs+18% vs U.S. average
Based on Providence County labor rates, local material logistics and permit-fee posture for this trade.
What the project looks like start to finish
Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.
01
Planning & quotes
Scope, material choice, contractor selection
02
Permit application
Filed with City of Pawtucket building department
03
Materials & staging
Order lead time on non-stock materials
04
Installation
3-6 weeks
05
Inspection
Rough plumbing, Shower pan water test, Final inspection
06
Closeout
Final sign-off, warranty and documentation
Pawtucket labor intelligence
What the trade charges here, and how much of your price it is.
Loaded hourly rate
$62–$81
Interior crews in Providence County · +22% vs U.S. ($58/hr)
Typical crew
3 × 6.5 days
On-site time for a typical bathroom job here.
Labor in the price
$11,000
50% of the median — the rest is material, disposal and permit.
Because labor is 50% of this job, Pawtucket wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.
Basis: Hometriva labor model: national interior crew rates adjusted by the Providence County labor factor (x1.221). · BLS Occupational Employment and Wage Statistics, Hometriva methodology
Why Pawtucket differs from the national average
The local delta, broken into dollars by driver.
Trade labor rates+$2,050
Providence County crews price 22% above the national average, and labor is 50% of this job.
Material and delivery+$1,025
Materials are nationally traded, so they move less — but delivery into this market runs 11% over baseline.
Code and inspection load+$275
Bathroom Remodel carries 20% exposure to local code requirements, and this jurisdiction's review load indexes at x1.07.
Permit fees+$50
Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.
Basis: Decomposition of the modeled Pawtucket median against the U.S. median for this scope. · City of Pawtucket building department, Hometriva methodology
Pawtucket vs Rhode Island vs the U.S.
Change the inputs, see your number
The same local model, run against your job instead of the average one.
Simulated bathroom remodel in Pawtucket
$22,315
Likely range $11,015 – $50,115
Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.
What makes the number move
- Tub-to-shower conversion versus like-for-like replacement
- Tile area and material
- Vanity, fixtures and glass enclosure
- Whether plumbing is relocated
- Waterproofing and subfloor repair
Who issues each permit
Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.
| Discipline | Issuing authority |
|---|---|
| building | City of Pawtucket building departmentModeled estimate |
| electrical | City of Pawtucket building departmentModeled estimate |
| mechanical | City of Pawtucket building departmentModeled estimate |
| plumbing | City of Pawtucket building departmentModeled estimate |
| zoning | City of Pawtucket building departmentModeled estimate |
| fire | City of Pawtucket building departmentModeled estimate |
Permit requirement in Pawtucket
It depends on scope. Like-for-like cosmetic work in Pawtucket is often exempt, but a permit is required as soon as you change structure, plumbing, electrical or the building envelope.
- Permitting authority
- City of Pawtucket building departmentModeled estimate
- Permit fee
- Estimated allowance $165–$660Modeled from comparable fee schedules — not an official quoted fee.
Inspections
- Rough plumbing
- Shower pan water test
- Final inspection
Local conditions that change this job
Only the exposures that materially affect bathroom remodel.
Humidity
Severe84/100
Pawtucket sits in Providence County, Rhode Island. Deep frost lines, snow load and a very old housing stock mean permits frequently touch structural, electrical and energy-code upgrades at once. Work outside city limits is permitted by the county building department rather than the city.
Owner-occupied homes
0%
Owner-occupied share of the housing stock, which drives how much of this work is homeowner-funded versus landlord-funded.
Households in market
30,242
Approximate household count in Pawtucket, used to size the contractor pool for this trade.
Permit activity index
x1.10
Relative permit volume and fee load versus the national baseline.
Nearby market comparison
What Pawtucket homeowners actually paid
Real reported invoices from this market, aggregated. Add yours — it takes 20 seconds and no personal details.
Quotes homeowners were given in Pawtucket
Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.
How Hometriva estimates Pawtucket bathroom costs
Hometriva does not publish invented city prices. The Pawtucket estimate for bathroom remodel is produced by this chain, and every input is stored separately:
- National baseline$18,500
Typical U.S. cost for bathroom remodel on a single-family home.
- Local labor factorx1.221
Pawtucket-area trade labor rates, weighted at 50% of this job.
- Material factorx1.111
Material and delivery pricing into Providence County, weighted at 50%.
- Regulatory factorx1.071
Local code, product-approval and inspection load, applied at 20% for this project type.
- Applied multiplierx1.183
Blended Pawtucket adjustment specific to bathroom remodel.
- Permit component$165 – $660
Budgeted separately from the contract price because it is paid to the jurisdiction.
Because labor, material and regulatory factors are weighted per project, bathroom remodel in Pawtucket carries a different local adjustment than other trades in the same market.
Reviewed by
Hometriva Cost Data Desk
Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for bathroom remodel pricing in Pawtucket, RI.
- • National unit-cost baselines against current trade pricing
- • Local labor and materials factors for the market
- • Material installed-cost ranges and service life
Last reviewed August 2026 · Editorial standards · Report an error
Frequently asked questions
Do I need a permit for a bathroom remodel?
Replacing a vanity, toilet or fixtures in the same location is usually permit-exempt. Rebuilding a shower pan, moving drain lines or adding circuits requires a plumbing or building permit and inspection.
Sources
Sources & verification
Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.
