Tub to Shower Conversion cost in Jacksonville, FL
Jacksonville, FL · updated August 2026
$7,000
Typical local cost
$3,400 – $15,600
Typical range
- per conversion
- $3,400 – $15,600
- Permit
- Usually yes
- Typical timeline
- 3-7 days of work
Installed, local pricing
$85 – $295 in fees
3-7 days of work, 2-5 weeks including permitting
Jacksonville runs -3% against the U.S. average · data confidence Medium · modeled estimate, not a quote
The modeled midpoint for Jacksonville is $7,000. The local adjustment for this trade is x0.974 — driven mainly by Duval County labor rates and 40% exposure to local code requirements.
Estimate your Jacksonville job
Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.
Tiles needed
57 tiles
Includes 12% waste
- Boxes to buy
- 8 boxes
- Thinset (50 lb bags)
- 2 bags
- Grout (25 lb bags)
- 1 bags
- Tile cost estimateMaterial only
- $273 – $982
Priced for Jacksonville (local adjustment x0.974).
Estimates only. Local pricing, site conditions and code requirements change the real number.
Cost by project size
Generated from the same unit pricing the calculator uses.
| Project size | Estimated range |
|---|---|
| Acrylic alcove unit | $2,600 – $11,700 |
| Tiled shower | $3,400 – $15,600 |
| Tile with glass enclosure | $4,400 – $20,300 |
| Curbless / roll-in shower | $5,800 – $26,500 |
Based on Jacksonville pricing of $3,400–$15,600 per conversion.
Where the money goes
- Labor
- $4,300
- 60% of median
- Materials
- $2,700
- 38% of median
- Permit & fees
- $190
- 3% of median
Jacksonville project costs-3% vs U.S. average
Based on Duval County labor rates, local material logistics and permit-fee posture for this trade.
What the project looks like start to finish
Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.
01
Planning & quotes
Scope, material choice, contractor selection
02
Permit application
Filed with City of Jacksonville Building Inspection Division
03
Materials & staging
Order lead time on non-stock materials
04
Installation
3-7 days of work, 2-5 weeks including permitting
05
Inspection
Plumbing rough-in, Shower pan water test, Final inspection
06
Closeout
Final sign-off, warranty and documentation
Jacksonville labor intelligence
What the trade charges here, and how much of your price it is.
Loaded hourly rate
$88–$113
Plumbing crews in Duval County · -5% vs U.S. ($105/hr)
Typical crew
2 × 2.5 days
On-site time for a typical tub to shower job here.
Labor in the price
$4,300
62% of the median — the rest is material, disposal and permit.
Because labor is 62% of this job, Jacksonville wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.
Basis: Hometriva labor model: national plumbing crew rates adjusted by the Duval County labor factor (x0.948). · BLS Occupational Employment and Wage Statistics, Hometriva methodology
Why Jacksonville differs from the national average
The local delta, broken into dollars by driver.
Trade labor rates-$225
Duval County crews price 5% below the national average, and labor is 62% of this job.
Code and inspection load+$50
Tub to Shower Conversion carries 40% exposure to local code requirements, and this jurisdiction's review load indexes at x1.01.
Basis: Decomposition of the modeled Jacksonville median against the U.S. median for this scope. · City of Jacksonville Building Inspection Division, Hometriva methodology
Jacksonville vs Florida vs the U.S.
Change the inputs, see your number
The same local model, run against your job instead of the average one.
Simulated tub to shower conversion in Jacksonville
$7,190
Likely range $3,590 – $15,790
Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.
What makes the number move
- Drain relocation from tub to shower position
- Tile versus acrylic shower base and walls
- Glass enclosure type
- Accessibility features such as grab bars and a bench
- Subfloor or slab repair after demolition
Who issues each permit
Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.
| Discipline | Issuing authority |
|---|---|
| building | City of Jacksonville Building Inspection DivisionConfirmed department |
| electrical | City of Jacksonville Building Inspection DivisionConfirmed department |
| mechanical | City of Jacksonville Building Inspection DivisionConfirmed department |
| plumbing | City of Jacksonville Building Inspection DivisionConfirmed department |
| zoning | City of Jacksonville Building Inspection DivisionConfirmed department |
| fire | City of Jacksonville Building Inspection DivisionConfirmed department |
Permit requirement in Jacksonville
In most cases yes — Duval County and the City of Jacksonville generally require a permit for tub to shower conversion. Height, size and location on the lot determine the exact review, so confirm with the building department before you start.
- Permitting authority
- City of Jacksonville Building Inspection DivisionConfirmed department
- Permit fee
- Based on declared project valuationJacksonville and Duval County are a consolidated government — one department serves both. Typical range for this scope: $85–$295.
Inspections
- Plumbing rough-in
- Shower pan water test
- Final inspection
Local conditions that change this job
Only the exposures that materially affect tub to shower conversion.
Humidity
Severe84/100
Jacksonville is a consolidated city-county government, so one building department covers nearly all of Duval County.
Nearby market comparison
| Market | Local factor | Median | Per conversion |
|---|---|---|---|
| Jacksonville (this page) | x0.974 | $7,000 | $3,400 – $15,600 |
| St. Augustine | x1.027 | $7,400 | $3,600 – $16,450 |
| Gainesville | x0.940 | $6,800 | $3,300 – $15,050 |
| Daytona Beach | x1.002 | $7,200 | $3,500 – $16,050 |
What Jacksonville homeowners actually paid
Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.
Quotes homeowners were given in Jacksonville
Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.
How Hometriva estimates Jacksonville tub to shower costs
Hometriva does not publish invented city prices. The Jacksonville estimate for tub to shower conversion is produced by this chain, and every input is stored separately:
- National baseline$7,200
Typical U.S. cost for tub to shower conversion on a single-family home.
- Local labor factorx0.948
Jacksonville-area trade labor rates, weighted at 62% of this job.
- Material factorx1.001
Material and delivery pricing into Duval County, weighted at 38%.
- Regulatory factorx1.015
Local code, product-approval and inspection load, applied at 40% for this project type.
- Applied multiplierx0.974
Blended Jacksonville adjustment specific to tub to shower conversion.
- Permit component$85 – $295
Budgeted separately from the contract price because it is paid to the jurisdiction.
Because labor, material and regulatory factors are weighted per project, tub to shower conversion in Jacksonville carries a different local adjustment than other trades in the same market.
Reviewed by
Hometriva Cost Data Desk
Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for tub to shower conversion pricing in Jacksonville, FL.
- • National unit-cost baselines against current trade pricing
- • Local labor and materials factors for the market
- • Material installed-cost ranges and service life
Last reviewed August 2026 · Editorial standards · Report an error
Frequently asked questions
Do I need a permit to convert a tub to a shower?
Usually yes. Moving or replacing the drain and valve is regulated plumbing work, so most Florida building departments require a plumbing permit and a shower pan water test.
How long does tub to shower conversion take?
3-7 days of work, 2-5 weeks including permitting. Permit review and inspection scheduling are usually the largest source of variation.
What changes the price the most?
The largest cost drivers are drain relocation from tub to shower position; tile versus acrylic shower base and walls; glass enclosure type.
Sources
Sources & verification
- City of Jacksonville Building Inspection Division
- Jacksonville permit portal
- Florida Building Commission
- BLS Occupational Employment and Wage Statistics
Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.
