Florida · Plumbing
Tub to Shower Conversion cost in Florida
Statewide pricing, permit posture and inspection sequence for tub to shower conversion in Florida. Your city or county issues the actual permit — use the local links below to confirm fees.
Verified August 2026
Tub to Shower Conversion cost in Florida
$3,600 – $16,600
Most Florida homeowners pay around $7,500, or $3,650–$16,650 per conversion. Permit fees typically add $105–$370.
Permit: Usually yes. Florida Building Code, 8th Edition (2023)
Cost breakdown
| Budget scope | $3,600 |
|---|---|
| Typical project | $7,500 |
| Premium / complex | $16,600 |
| per conversion | $3,650 – $16,650 |
| Permit fees | $105 – $370 |
| vs national baseline | +4% |
| Timeline | 3-7 days of work, 2-5 weeks including permitting |
What is different about tub to shower conversion in Florida
One statewide code is enforced by 67 counties and 411 municipalities, and wind-borne debris, product approval and flood 50% rules change the scope of nearly every exterior project.
Owner-builder: Owner-builder exemption available on an owner-occupied home under FS 489.103(7). Tub to Shower Conversion generally requires a licensed contractor to pull the permit, even where owner-builder status is available.
Inspections
- Plumbing rough-in
- Shower pan water test
- Final inspection
What drives the price
- Drain relocation from tub to shower position
- Tile versus acrylic shower base and walls
- Glass enclosure type
- Accessibility features such as grab bars and a bench
- Subfloor or slab repair after demolition
Tub to Shower pricing by city
Frequently asked questions
Do I need a permit to convert a tub to a shower?
Usually yes. Moving or replacing the drain and valve is regulated plumbing work, so most Florida building departments require a plumbing permit and a shower pan water test.