Do you need a permit for tub to shower conversion in Orlando, FL?

Tub to Shower Conversion permit in Orlando

Usually yes

In most cases yes — Orange County and the City of Orlando generally require a permit for tub to shower conversion. Height, size and location on the lot determine the exact review, so confirm with the building department before you start.

Permitting authority: City of Orlando Permitting ServicesConfirmed department for work inside city limits; addresses outside city limits are permitted by Orange County.

Issuing department confirmed as City of Orlando Permitting Services. The permit requirement itself is typical guidance for this scope, not a reading of a local ordinance — confirm it with the department before you apply. Model vintage August 2026. Dollar figures are modeled estimates, not quotes.

How hard is this permit?

Scored from the stored permit requirement, trade reviews, inspection load, wind and flood overlays, and how this jurisdiction sets its fees.

Permit complexity: Complex

56/100 on the Hometriva Permit Complexity Index

Tub to Shower permits in Orlando score 56/100 on the Hometriva Permit Complexity Index (complex). Expect roughly 5–18 calendar days of review and 3 inspections, plus 1 added review.

Plan review
518 days
Inspections
3
Added reviews
1
  • Plumbing review
How this score is calculated
FactorScoreWhy
Permit requirement17/22Tub to Shower Conversion is usually required in Orlando.
Trade reviews6/181 discipline review beyond building: plumbing review.
Inspection load12/163 scheduled inspections on a typical job.
Wind & storm review6/16Standard wind design region; product approval is routine.
Coastal & flood overlays5/14Overlay review is uncommon on inland parcels.
Jurisdiction process10/14City of Orlando Permitting Services issues the permit; fees are set by a valuation formula, so the fee scales with job cost.

Who issues each permit

Disciplines are tracked separately — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Orlando Permitting ServicesConfirmed department
electricalCity of Orlando Permitting ServicesConfirmed department
mechanicalCity of Orlando Permitting ServicesConfirmed department
plumbingCity of Orlando Permitting ServicesConfirmed department
zoningCity of Orlando Permitting ServicesConfirmed department
fireCity of Orlando Permitting ServicesConfirmed department

Permit facts

Permit authorityCity of Orlando Permitting Services[building department]Confirmed department
Permit feeBased on declared project valuationSee the department's adopted fee schedule. Typical range for this scope: $90$320.
Who can pull itLicensed contractor
Owner-builderAllowed on owner-occupied homes
InspectionsPlumbing rough-in, Shower pan water test, Final inspection
Typical review timeModeled from complexity score, not a published SLA.5–18 calendar days
Typical timeline3-7 days of work, 2-5 weeks including permitting

Documents to submit

  • Plumbing permit application
  • Contractor license and insurance

How to apply in Orlando

  1. 1. Confirm scope with City of Orlando Permitting Services — exemptions vary by scope, not project type.
  2. 2. Prepare the documents above, including product approvals where wind-borne debris rules apply.
  3. 3. Submit through the Orlando permit portal and pay the review fee.
  4. 4. Schedule each required inspection as the work reaches that stage.
  5. 5. Get the final inspection signed off. An open permit can surface in a title search and often has to be closed before a sale completes, so do not leave it open.

What happens if you skip the permit

Unpermitted work commonly triggers double permit fees, a code enforcement lien, forced exposure of concealed work, insurance claim denial, and a failed disclosure at closing. Retroactive permits are possible but cost more and can require tearing out finished work.

Frequently asked questions

Do I need a permit to convert a tub to a shower?

Usually yes. Moving or replacing the drain and valve is regulated plumbing work, so most Florida building departments require a plumbing permit and a shower pan water test.

How long does tub to shower conversion take?

3-7 days of work, 2-5 weeks including permitting. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are drain relocation from tub to shower position; tile versus acrylic shower base and walls; glass enclosure type.

What this permit actually cost

Fee schedules are published; what an office charges on a real job is not. Recorded permits are how modeled fees become verified fees.

Fee and valuation only — no address or permit number.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.

Related pages