Mississippi · Plumbing
Tub to Shower Conversion cost in Mississippi
Statewide pricing, permit posture and inspection sequence for tub to shower conversion in Mississippi. Your city or county issues the actual permit — use the local links below to confirm fees.
Verified August 2026
Tub to Shower Conversion cost in Mississippi
$3,000 – $13,600
Most Mississippi homeowners pay around $6,100, or $3,000–$13,600 per conversion. Permit fees typically add $70–$255.
Permit: Usually yes. Code adoption is local — local adoption of the irc; coastal counties enforce wind requirements.
Cost breakdown
| Budget scope | $3,000 |
|---|---|
| Typical project | $6,100 |
| Premium / complex | $13,600 |
| per conversion | $3,000 – $13,600 |
| Permit fees | $70 – $255 |
| vs national baseline | -15% |
| Timeline | 3-7 days of work, 2-5 weeks including permitting |
What is different about tub to shower conversion in Mississippi
The six coastal counties carry wind-borne debris and elevation rules; much of the interior has minimal residential permitting, which is the biggest single cost split in the state.
Owner-builder: Homeowner permits widely allowed. Tub to Shower Conversion generally requires a licensed contractor to pull the permit, even where owner-builder status is available.
Inspections
- Plumbing rough-in
- Shower pan water test
- Final inspection
What drives the price
- Drain relocation from tub to shower position
- Tile versus acrylic shower base and walls
- Glass enclosure type
- Accessibility features such as grab bars and a bench
- Subfloor or slab repair after demolition
Frequently asked questions
Do I need a permit to convert a tub to a shower?
Usually yes. Moving or replacing the drain and valve is regulated plumbing work, so most Florida building departments require a plumbing permit and a shower pan water test.
Sources
Sources & verification
Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.
