Tub to Shower Conversion cost in Bismarck, ND

Bismarck, ND · updated August 2026

$7,100

Typical local cost

$3,400 – $15,700

Typical range

per conversion
$3,450 – $15,700

Installed, local pricing

Permit
Usually yes

$75 – $260 in fees

Typical timeline
3-7 days of work

3-7 days of work, 2-5 weeks including permitting

Calculate my tub to shower cost

Bismarck runs -2% against the U.S. average · data confidence Medium · modeled estimate, not a quote

Most Bismarck homeowners pay around $7,100. The local adjustment for this trade is x0.981 — driven mainly by Burleigh County labor rates and 40% exposure to local code requirements.

Estimate your Bismarck job

Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.

Tiles needed

57 tiles

Includes 12% waste

Boxes to buy
8 boxes
Thinset (50 lb bags)
2 bags
Grout (25 lb bags)
1 bags
Tile cost estimateMaterial only
$274 – $988

Estimates only. Local pricing, site conditions and code requirements change the real number.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
1 conversion$3,500$15,700
1 conversion$3,500$15,700
1 conversion$3,500$15,700
1 conversion$3,500$15,700
1 conversion$3,500$15,700

Based on Bismarck pricing of $3,450–$15,700 per conversion.

Where the money goes

Labor
$4,400
61% of median
Materials
$2,700
37% of median
Permit & fees
$170
2% of median

Bismarck project costs-2% vs U.S. average

Based on Burleigh County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Bismarck building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    3-7 days of work, 2-5 weeks including permitting

  5. 05

    Inspection

    Plumbing rough-in, Shower pan water test, Final inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Bismarck labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$90–$117

Plumbing crews in Burleigh County · -3% vs U.S. ($105/hr)

Typical crew

2 × 2.5 days

On-site time for a typical tub to shower job here.

Labor in the price

$4,400

62% of the median — the rest is material, disposal and permit.

Because labor is 62% of this job, Bismarck wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national plumbing crew rates adjusted by the Burleigh County labor factor (x0.974). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Bismarck differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$125Permit fees$25Code and inspection load$25
Dollars of the Bismarck difference owned by each driver, versus the U.S. median for tub to shower conversion.
  • Trade labor rates-$125

    Burleigh County crews price 3% below the national average, and labor is 62% of this job.

  • Permit fees-$25

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

  • Code and inspection load-$25

    Tub to Shower Conversion carries 40% exposure to local code requirements, and this jurisdiction's review load indexes at x0.99.

Basis: Decomposition of the modeled Bismarck median against the U.S. median for this scope. · City of Bismarck building department, Hometriva methodology

Bismarck vs North Dakota vs the U.S.

Bismarck$3,400$15,700North Dakota average$3,400$15,700U.S. average$3,500$16,000
Modeled ranges for tub to shower conversion. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated tub to shower conversion in Bismarck

$7,270

Likely range $3,570$15,870

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Drain relocation from tub to shower position
  • Tile versus acrylic shower base and walls
  • Glass enclosure type
  • Accessibility features such as grab bars and a bench
  • Subfloor or slab repair after demolition

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Bismarck building departmentModeled estimate
electricalCity of Bismarck building departmentModeled estimate
mechanicalCity of Bismarck building departmentModeled estimate
plumbingCity of Bismarck building departmentModeled estimate
zoningCity of Bismarck building departmentModeled estimate
fireCity of Bismarck building departmentModeled estimate

Permit requirement in Bismarck

In most cases yes — Burleigh County and the City of Bismarck generally require a permit for tub to shower conversion. Height, size and location on the lot determine the exact review, so confirm with the building department before you start.

Permitting authority
City of Bismarck building departmentModeled estimate
Permit fee
Estimated allowance $75$260Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Plumbing rough-in
  2. Shower pan water test
  3. Final inspection
Full Bismarck permit guide for tub to shower conversion

Local conditions that change this job

Only the exposures that materially affect tub to shower conversion.

Humidity

Severe84/100

Bismarck sits in Burleigh County, North Dakota. Heavy snow load and ice-dam risk change roofing, insulation and gutter specifications, and compress the outdoor work season. Work outside city limits is permitted by the county building department rather than the city.

Nearby market comparison

MarketLocal factorMedianPer conversion
Bismarck (this page)x0.981$7,100$3,450$15,700
Fargox0.981$7,100$3,450$15,700
Grand Forksx0.946$6,800$3,300$15,150
Minotx0.946$6,800$3,300$15,150

What Bismarck homeowners actually paid

Real reported invoices from this market, aggregated. Add yours — it takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Bismarck

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Bismarck tub to shower costs

Hometriva does not publish invented city prices. The Bismarck estimate for tub to shower conversion is produced by this chain, and every input is stored separately:

  1. National baseline$7,200

    Typical U.S. cost for tub to shower conversion on a single-family home.

  2. Local labor factorx0.974

    Bismarck-area trade labor rates, weighted at 62% of this job.

  3. Material factorx1.005

    Material and delivery pricing into Burleigh County, weighted at 38%.

  4. Regulatory factorx0.989

    Local code, product-approval and inspection load, applied at 40% for this project type.

  5. Applied multiplierx0.981

    Blended Bismarck adjustment specific to tub to shower conversion.

  6. Permit component$75 – $260

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, tub to shower conversion in Bismarck carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for tub to shower conversion pricing in Bismarck, ND.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

Do I need a permit to convert a tub to a shower?

Usually yes. Moving or replacing the drain and valve is regulated plumbing work, so most Florida building departments require a plumbing permit and a shower pan water test.

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.

Related pages