St. Augustine, FL · St. Johns County

Bathroom Remodel in St. Augustine, FL: Cost & Permits

What bathroom remodel actually costs in St. Augustine, whether you need a permit, which inspections apply, and how long the job takes.

Verified August 2026

Typical local cost

$18,500

$9,000 – $42,000

per bathroom

$9,000 – $42,000

Permit fee

$150 – $600

St. Johns County estimate

vs national

0%

local labor & materials

Do you need a permit for bathroom remodel in St. Augustine, FL?

It depends

It depends on scope. Like-for-like cosmetic work in St. Augustine is often exempt, but a permit is required as soon as you change structure, plumbing, electrical or the building envelope.

Historic district properties face additional design review that can add weeks to exterior projects.

Cost breakdown in St. Augustine

Low endSimple scope, competitive bid$9,000
TypicalMost homeowners land here$18,500
High endComplex access, premium materials$42,000
per bathroom$9,000 – $42,000
Permit fee estimate$150 – $600
Timeline3-6 weeks

Math: national baseline $9,000$42,000 × St. Augustine cost index 1.00. Permit fees use a 1.00 local multiplier. Estimates, not quotes.

What drives your price here

  • Tub-to-shower conversion versus like-for-like replacement
  • Tile area and material
  • Vanity, fixtures and glass enclosure
  • Whether plumbing is relocated
  • Waterproofing and subfloor repair

Permit process and inspections

Permit requiredIt depends
Who pulls itContractor or owner-builder
InspectionsRough plumbing, Shower pan water test, Final inspection
DocumentsPermit application, Plumbing scope, Waterproofing details for shower pans
ApplySt. Augustine permit portal

Frequently asked questions

Do I need a permit for a bathroom remodel?

Replacing a vanity, toilet or fixtures in the same location is usually permit-exempt. Rebuilding a shower pan, moving drain lines or adding circuits requires a plumbing or building permit and inspection.

Bathroom costs in nearby cities

Sources

Sources & verification

Last verified August 2026. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing — they are not quotes. Permit rules change; confirm with the building department before starting work.

Page data quality: 100/100
  • Verified permit status
  • Official source linked
  • Local cost range
  • Inspection detail
  • Unique local rule
  • Local fee estimate
  • Useful FAQ
  • Relevant calculator
  • Internal links