Do you need a permit for tub to shower conversion in Orange County?

Usually yes

In most cases yes — Orange County and the City of Unincorporated Orange County generally require a permit for tub to shower conversion. Height, size and location on the lot determine the exact review, so confirm with the building department before you start.

Budget $3,700 – $16,800 for the work itself (typically $7,600) plus a modeled $95–$345 permit allowance. Dollar figures are modeled, not quoted.

Permit authority: Orange County building departmentConfirmed department for unincorporated addresses.

Orange County cost model

Budget scope$3,700
Typical project$7,600
Premium / complex$16,800
per conversion$3,700 – $16,850
Permit feesModeled allowance$95 – $345
vs national baseline+5%
Timeline3-7 days of work, 2-5 weeks including permitting

Inspections typically required

Typical inspection sequence for this project type under the Florida code basis. Orange County and the cities inside it can add, combine or waive inspections — confirm the sequence with the permitting authority before scheduling.

  • Plumbing rough-in
  • Shower pan water test
  • Final inspection

Documents usually requested at submittal

Common submittal items for this project type. The exact checklist is set by the authority that issues your permit and can differ inside the county.

  • Plumbing permit application
  • Contractor license and insurance

Cities inside the county that permit their own work

If the property is inside these municipalities, apply to the city rather than the county.

Statewide rules that apply here

Orange County enforces the 8th Edition (2023) Florida Building Code, effective December 31, 2023. Local amendments can add requirements but cannot reduce the statewide minimum.

Frequently asked questions

Do I need a permit to convert a tub to a shower?

Usually yes. Moving or replacing the drain and valve is regulated plumbing work, so most Florida building departments require a plumbing permit and a shower pan water test.

How long does tub to shower conversion take?

3-7 days of work, 2-5 weeks including permitting. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are drain relocation from tub to shower position; tile versus acrylic shower base and walls; glass enclosure type.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.