Kitchen Remodel cost in Silver Spring, MD

Silver Spring, MD · updated August 2026

$43,600

Typical local cost

$20,400 – $104,100

Typical range

per kitchen
$20,400 – $104,150

Installed, local pricing

Permit
It depends

$220 – $1,045 in fees

Typical timeline
6-12 weeks

6-12 weeks

Calculate my kitchen cost

Silver Spring runs +13% against the U.S. average · data confidence Medium · modeled estimate, not a quote

The modeled midpoint for Silver Spring is $43,600. The local adjustment for this trade is x1.132 — driven mainly by Montgomery County labor rates and 20% exposure to local code requirements.

Estimate your Silver Spring job

Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.

Flooring to buy

330 sq ft

300 sq ft room + 10% waste

Boxes needed
14 boxes
Installed cost estimate
$2,021 – $3,090
Underlayment
300 sq ft

Priced for Silver Spring (local adjustment x1.132).

Estimates only. Local pricing, site conditions and code requirements change the real number.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
Small kitchen (under 100 sq ft)$14,300$72,900
Midsize kitchen (100–200 sq ft)$20,400$104,100
Large kitchen (200–300 sq ft)$28,600$145,700
Full gut with layout change$40,800$208,200

Based on Silver Spring pricing of $20,400–$104,150 per kitchen.

Where the money goes

Labor
$19,600
44% of median
Materials
$24,000
54% of median
Permit & fees
$635
1% of median

Silver Spring project costs+13% vs U.S. average

Based on Montgomery County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Silver Spring building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    6-12 weeks

  5. 05

    Inspection

    Rough plumbing and electrical, Framing where walls change, Final building inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Silver Spring labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$59–$76

Interior crews in Montgomery County · +16% vs U.S. ($58/hr)

Typical crew

4 × 9 days

On-site time for a typical kitchen job here.

Labor in the price

$19,600

45% of the median — the rest is material, disposal and permit.

Because labor is 45% of this job, Silver Spring wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national interior crew rates adjusted by the Montgomery County labor factor (x1.156). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Silver Spring differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$2,700Material and delivery$1,750Code and inspection load$550Permit fees$50
Dollars of the Silver Spring difference owned by each driver, versus the U.S. median for kitchen remodel.
  • Trade labor rates+$2,700

    Montgomery County crews price 16% above the national average, and labor is 45% of this job.

  • Material and delivery+$1,750

    Materials are nationally traded, so they move less — but delivery into this market runs 8% over baseline.

  • Code and inspection load+$550

    Kitchen Remodel carries 20% exposure to local code requirements, and this jurisdiction's review load indexes at x1.07.

  • Permit fees+$50

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

Basis: Decomposition of the modeled Silver Spring median against the U.S. median for this scope. · City of Silver Spring building department, Hometriva methodology

Silver Spring vs Maryland vs the U.S.

Silver Spring$20,400$104,100Maryland average$20,400$104,100U.S. average$18,000$92,000
Modeled ranges for kitchen remodel. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated kitchen remodel in Silver Spring

$44,235

Likely range $21,035$104,735

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Cabinet grade: stock, semi-custom or custom
  • Countertop material and square footage
  • Whether plumbing or electrical is relocated
  • Appliance package
  • Flooring and any wall removal

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Silver Spring building departmentModeled estimate
electricalCity of Silver Spring building departmentModeled estimate
mechanicalCity of Silver Spring building departmentModeled estimate
plumbingCity of Silver Spring building departmentModeled estimate
zoningCity of Silver Spring building departmentModeled estimate
fireCity of Silver Spring building departmentModeled estimate

Permit requirement in Silver Spring

It depends on scope. Like-for-like cosmetic work in Silver Spring is often exempt, but a permit is required as soon as you change structure, plumbing, electrical or the building envelope.

Permitting authority
City of Silver Spring building departmentModeled estimate
Permit fee
Estimated allowance $220$1,045Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Rough plumbing and electrical
  2. Framing where walls change
  3. Final building inspection
Full Silver Spring permit guide for kitchen remodel

Local conditions that change this job

Only the exposures that materially affect kitchen remodel.

Humidity

Severe84/100

Silver Spring sits in Montgomery County, Maryland. Deep frost lines, snow load and a very old housing stock mean permits frequently touch structural, electrical and energy-code upgrades at once. Work outside city limits is permitted by the county building department rather than the city.

Owner-occupied homes

0%

Owner-occupied share of the housing stock, which drives how much of this work is homeowner-funded versus landlord-funded.

Households in market

32,726

Approximate household count in Silver Spring, used to size the contractor pool for this trade.

Permit activity index

x1.10

Relative permit volume and fee load versus the national baseline.

Nearby market comparison

MarketLocal factorMedianPer kitchen
Silver Spring (this page)x1.132$43,600$20,400$104,150
Washingtonx1.233$47,500$22,200$113,450
Rockvillex1.132$43,600$20,400$104,150
Arlingtonx1.064$41,000$19,150$97,900

What Silver Spring homeowners actually paid

Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Silver Spring

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Silver Spring kitchen costs

Hometriva does not publish invented city prices. The Silver Spring estimate for kitchen remodel is produced by this chain, and every input is stored separately:

  1. National baseline$38,500

    Typical U.S. cost for kitchen remodel on a single-family home.

  2. Local labor factorx1.156

    Silver Spring-area trade labor rates, weighted at 45% of this job.

  3. Material factorx1.083

    Material and delivery pricing into Montgomery County, weighted at 55%.

  4. Regulatory factorx1.071

    Local code, product-approval and inspection load, applied at 20% for this project type.

  5. Applied multiplierx1.132

    Blended Silver Spring adjustment specific to kitchen remodel.

  6. Permit component$220 – $1,045

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, kitchen remodel in Silver Spring carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for kitchen remodel pricing in Silver Spring, MD.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

Do I need a permit for a kitchen remodel?

Cosmetic replacement — cabinets in the same location, countertops, appliances, paint and flooring — typically does not require a permit. You do need one as soon as you move plumbing or electrical, add circuits, or alter walls.

How long does a kitchen remodel take?

A cosmetic refresh runs 3-5 weeks. A full gut with layout changes and permits typically runs 8-12 weeks, with cabinet lead time as the most common bottleneck.

How long does kitchen remodel take?

6-12 weeks. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are cabinet grade: stock, semi-custom or custom; countertop material and square footage; whether plumbing or electrical is relocated.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.

Related pages