Kitchen Remodel cost in Roswell, NM

Roswell, NM · updated August 2026

$35,700

Typical local cost

$16,700 – $85,300

Typical range

per kitchen
$16,700 – $85,300

Installed, local pricing

Permit
It depends

$165 – $790 in fees

Typical timeline
6-12 weeks

6-12 weeks

Calculate my kitchen cost

Roswell runs -7% against the U.S. average · data confidence Medium · modeled estimate, not a quote

The modeled midpoint for Roswell is $35,700. The local adjustment for this trade is x0.927 — driven mainly by Chaves County labor rates and 20% exposure to local code requirements.

Estimate your Roswell job

Priced with this market's cost index, so the calculator, the size table and the ranges on this page all agree.

Flooring to buy

330 sq ft

300 sq ft room + 10% waste

Boxes needed
14 boxes
Installed cost estimate
$1,655 – $2,531
Underlayment
300 sq ft

Priced for Roswell (local adjustment x0.927).

Estimates only. Local pricing, site conditions and code requirements change the real number.

Cost by project size

Generated from the same unit pricing the calculator uses.

Estimated cost by project size
Project sizeEstimated range
Small kitchen (under 100 sq ft)$11,700$59,700
Midsize kitchen (100–200 sq ft)$16,700$85,300
Large kitchen (200–300 sq ft)$23,400$119,400
Full gut with layout change$33,400$170,600

Based on Roswell pricing of $16,700–$85,300 per kitchen.

Where the money goes

Labor
$16,100
44% of median
Materials
$19,600
54% of median
Permit & fees
$480
1% of median

Roswell project costs-7% vs U.S. average

Based on Chaves County labor rates, local material logistics and permit-fee posture for this trade.

What the project looks like start to finish

Typical sequence for this scope. Timing varies with contractor backlog and plan-review queues.

  1. 01

    Planning & quotes

    Scope, material choice, contractor selection

  2. 02

    Permit application

    Filed with City of Roswell building department

  3. 03

    Materials & staging

    Order lead time on non-stock materials

  4. 04

    Installation

    6-12 weeks

  5. 05

    Inspection

    Rough plumbing and electrical, Framing where walls change, Final building inspection

  6. 06

    Closeout

    Final sign-off, warranty and documentation

Roswell labor intelligence

What the trade charges here, and how much of your price it is.

Loaded hourly rate

$45–$58

Interior crews in Chaves County · -12% vs U.S. ($58/hr)

Typical crew

4 × 10 days

On-site time for a typical kitchen job here.

Labor in the price

$16,100

45% of the median — the rest is material, disposal and permit.

Because labor is 45% of this job, Roswell wage levels move the price far more than material prices do. A quote well under this labor figure usually means a smaller crew, a longer schedule, or unlicensed help.

Basis: Hometriva labor model: national interior crew rates adjusted by the Chaves County labor factor (x0.883). · BLS Occupational Employment and Wage Statistics, Hometriva methodology

Why Roswell differs from the national average

The local delta, broken into dollars by driver.

Trade labor rates$2,025Material and delivery$750Permit fees$100Code and inspection load$50
Dollars of the Roswell difference owned by each driver, versus the U.S. median for kitchen remodel.
  • Trade labor rates-$2,025

    Chaves County crews price 12% below the national average, and labor is 45% of this job.

  • Material and delivery-$750

    Materials are nationally traded, so they move less — but delivery into this market runs 4% under baseline.

  • Permit fees-$100

    Fees are paid to the jurisdiction, not the contractor, and are budgeted separately from the contract price.

  • Code and inspection load-$50

    Kitchen Remodel carries 20% exposure to local code requirements, and this jurisdiction's review load indexes at x0.99.

Basis: Decomposition of the modeled Roswell median against the U.S. median for this scope. · City of Roswell building department, Hometriva methodology

Roswell vs New Mexico vs the U.S.

Roswell$16,700$85,300New Mexico average$17,200$88,000U.S. average$18,000$92,000
Modeled ranges for kitchen remodel. The tick marks the median in each geography.

Change the inputs, see your number

The same local model, run against your job instead of the average one.

Simulated kitchen remodel in Roswell

$36,180

Likely range $17,180$85,780

Simulated from the same local model as the numbers above — it changes the inputs, not the pricing method.

What makes the number move

  • Cabinet grade: stock, semi-custom or custom
  • Countertop material and square footage
  • Whether plumbing or electrical is relocated
  • Appliance package
  • Flooring and any wall removal

Who issues each permit

Tracked per discipline — the building permit issuer is not always the body that reviews electrical, plumbing, zoning or fire.

Permitting authority by discipline
DisciplineIssuing authority
buildingCity of Roswell building departmentModeled estimate
electricalCity of Roswell building departmentModeled estimate
mechanicalCity of Roswell building departmentModeled estimate
plumbingCity of Roswell building departmentModeled estimate
zoningCity of Roswell building departmentModeled estimate
fireCity of Roswell building departmentModeled estimate

Permit requirement in Roswell

It depends on scope. Like-for-like cosmetic work in Roswell is often exempt, but a permit is required as soon as you change structure, plumbing, electrical or the building envelope.

Permitting authority
City of Roswell building departmentModeled estimate
Permit fee
Estimated allowance $165$790Modeled from comparable fee schedules — not an official quoted fee.

Inspections

  1. Rough plumbing and electrical
  2. Framing where walls change
  3. Final building inspection
Full Roswell permit guide for kitchen remodel

Local conditions that change this job

Only the exposures that materially affect kitchen remodel.

Humidity

Severe84/100

Owner-occupied homes

0%

Owner-occupied share of the housing stock, which drives how much of this work is homeowner-funded versus landlord-funded.

Households in market

18,990

Approximate household count in Roswell, used to size the contractor pool for this trade.

Permit activity index

x0.83

Relative permit volume and fee load versus the national baseline.

Nearby market comparison

MarketLocal factorMedianPer kitchen
Roswell (this page)x0.927$35,700$16,700$85,300
Las Crucesx0.956$36,800$17,200$87,950

What Roswell homeowners actually paid

Homeowner-reported invoices for this market. Nothing is published until enough reports clear review, so this section is often empty in newer markets — adding yours takes 20 seconds and no personal details.

No name, email or address is collected. Reports are reviewed before they count.

Quotes homeowners were given in Roswell

Quotes run ahead of final invoices. Reporting yours shows the local spread and where there is room to negotiate.

No name, email or address is collected.

How Hometriva estimates Roswell kitchen costs

Hometriva does not publish invented city prices. The Roswell estimate for kitchen remodel is produced by this chain, and every input is stored separately:

  1. National baseline$38,500

    Typical U.S. cost for kitchen remodel on a single-family home.

  2. Local labor factorx0.883

    Roswell-area trade labor rates, weighted at 45% of this job.

  3. Material factorx0.965

    Material and delivery pricing into Chaves County, weighted at 55%.

  4. Regulatory factorx0.992

    Local code, product-approval and inspection load, applied at 20% for this project type.

  5. Applied multiplierx0.927

    Blended Roswell adjustment specific to kitchen remodel.

  6. Permit component$165 – $790

    Budgeted separately from the contract price because it is paid to the jurisdiction.

Because labor, material and regulatory factors are weighted per project, kitchen remodel in Roswell carries a different local adjustment than other trades in the same market.

Reviewed by

Hometriva Cost Data Desk

Maintains the unit-cost baselines, local adjustment factors and material pricing. Reviewed for kitchen remodel pricing in Roswell, NM.

  • National unit-cost baselines against current trade pricing
  • Local labor and materials factors for the market
  • Material installed-cost ranges and service life

Last reviewed August 2026 · Editorial standards · Report an error

Frequently asked questions

Do I need a permit for a kitchen remodel?

Cosmetic replacement — cabinets in the same location, countertops, appliances, paint and flooring — typically does not require a permit. You do need one as soon as you move plumbing or electrical, add circuits, or alter walls.

How long does a kitchen remodel take?

A cosmetic refresh runs 3-5 weeks. A full gut with layout changes and permits typically runs 8-12 weeks, with cabinet lead time as the most common bottleneck.

How long does kitchen remodel take?

6-12 weeks. Permit review and inspection scheduling are usually the largest source of variation.

What changes the price the most?

The largest cost drivers are cabinet grade: stock, semi-custom or custom; countertop material and square footage; whether plumbing or electrical is relocated.

Sources

Sources & verification

Model vintage August 2026. The links above are the issuing agencies' own pages — we publish them so you can confirm the current rule yourself, not as evidence that each fact on this page was re-checked with them today. Cost figures are modeled estimates based on national baselines adjusted for local labor and material pricing, not quotes. Permit rules change; confirm with the building department before starting work.

Related pages